Laserfiche WebLink
fl <br />The Floyd & Snider Team <br />4.0 <br />The City of Everett <br />Everett Landfill/Tire Fire Site <br />3.4.2.5 Contingency Plan Triggers <br />3-6 <br />3.4.2.6 Contingency Plan <br />3-6 <br />3.4.3 OFF -SITE BUILDING GAS MONITORING <br />3-6 <br />3.4.3.1 Sampling and Inspection Plan <br />3-6 <br />3.4.3.2 Frequency of Sampling <br />3-7 <br />3.4.3.3 Evaluation Methods <br />3-7 <br />3.4.3.4 Reporting Requirements <br />3-7 <br />3.4.3.5 Contingency Plan Triggers <br />3-7 <br />3.4.3.6 Contingency Plan <br />3-7 <br />3.5 <br />LANDFILL GAS MONITORING FOR DEVELOPMENT AREAS <br />3-8 <br />3.5.1 ALARM SYSTEM <br />3-8 <br />3.5.2 SAMPLING AND INSPECTION PLAN <br />3-8 <br />3.5.3 FREQUENCY OF SAMPLING <br />3-8 <br />3.5.4 EVALUATION METHODS <br />3-9 <br />3.5.5 REPORTING REQUIREMENTS <br />3-9 <br />3.5.6 CONTINGENCY PLAN TRIGGERS <br />3-9 <br />3.5.7 CONTINGENCY PLAN <br />3-9 <br />3.6 <br />CONFIRMATIONAL SAMPLING AT LANDFILL GAS DISCHARGE POINTS <br />3-10 <br />3.6.1 SAMPLING AND INSPECTION PLAN <br />3-10 <br />3.6.2 FREQUENCY OF SAMPLING <br />3-12 <br />3.6.3 EVALUATION METHODS <br />3-12 <br />3.6.4 REPORTING REQUIREMENTS <br />3-12 <br />3.6.5 CONTINGENCY PLAN <br />3-12 <br />Groundwater Pathway <br />4-1 <br />4.1 <br />OBJECTIVES <br />4-1 <br />4.2 <br />COMPLIANCE CRITERIA <br />4-1 <br />4.3 <br />INSPECTION REQUIREMENTS <br />4-2 <br />4.4 <br />EVALUATION MONITORING <br />4-3 <br />4.4.1 EVALUATION MONITORING PLAN <br />4-3 <br />4.4.1.1 Monitoring Well Network Improvements <br />4-3 <br />4.4.1.2 Water Level Monitoring <br />4-5 <br />4.4.1.3 Sampling Methods <br />4-6 <br />4.4.1.3 Sampling Parameters <br />4-6 <br />docs\j ompli Oce Mo Everett lan\CMC)F maker- final Compliance Monitoring and Contingency Plan <br />docslCompliance Monitoring PIan1CMCP 11-10-OO.doc <br />FINAL - March 2001 Page ii <br />