Laserfiche WebLink
The City of Everett <br />The Floyd & Snider Team Everett Landfill/Tire Fire Site <br />5.4.1 CONTINGENCY MEASURES FOR PROBLEM AREAS IDENTIFIED THROUGH <br />INSPECTIONS <br />5-4 <br />5.4.2 CONTINGENCY MEASURES FOR CONSTRUCTION ACTIVITIES <br />5-5 <br />6.0 Surface Water Pathway <br />6-1 <br />6.1 <br />OBJECTIVES <br />6-1 <br />6.2 <br />SAMPLING AND INSPECTION PLAN <br />6-1 <br />6.3 <br />FREQUENCY OF SAMPLING <br />6-2 <br />6.4 <br />EVALUATION METHODS <br />6-2 <br />6.4.1 SURFACE WATER <br />6-3 <br />6.4.2 SWPPP <br />6-3 <br />6.5 <br />REPORTING REQUIREMENTS <br />6-3 <br />6.6 <br />CONTINGENCY PLAN TRIGGERS <br />6-3 <br />6.6.1 SURFACE WATER <br />6-3 <br />6.6.2 SWPPP <br />6-4 <br />6.7 <br />CONTINGENCY PLAN <br />6-4 <br />6.7.1 SURFACE WATER SAMPLING <br />6-4 <br />6.7.2 SWPPP <br />6-4 <br />7.0 References <br />7-1 <br />doprojects\COEvMR Everett Plandfil CP 11 aker 1O-O final Compliance Monitoring and Contingency Plan <br />docslCompliance Monitoring Plan\CMCP 11-1 o-OO.doc p 9 9 y <br />FINAL - March 2001 Page iv <br />