My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3800 RIVERFRONT BLVD 2025-07-23
>
Address Records
>
RIVERFRONT BLVD
>
3800
>
3800 RIVERFRONT BLVD 2025-07-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2025 3:49:01 PM
Creation date
6/18/2025 10:18:28 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3800
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />The City of Everett <br />The Floyd & Snider Team Everett Landfill/Tire Fire Site <br />4-6 <br />4.4.2 EVALUATION MONITORING SCHEDULE <br />4.4.3 REPORTING REQUIREMENTS <br />4-6 <br />4.4.3.1 Contaminants of Concern <br />4-7 <br />4.5 PERFORMANCE MONITORING <br />4-7 <br />4.5.1 PERFORMANCE MONITORING PLAN <br />4-7 <br />4.5.1.1 Water Elevation Monitoring <br />4-8 <br />4.5.1.2 Sampling Methods <br />4-8 <br />4.5.1.3 Sampling Parameters <br />4-8 <br />4.5.2 PERFORMANCE MONITORING SCHEDULE <br />4-8 <br />4.5.3 REPORTING REQUIREMENTS <br />4-9 <br />4.6 CONFIRMATIONAL MONITORING <br />4-9 <br />4.6.1 CONFIRMATIONAL MONITORING PLAN <br />4-9 <br />4.6.2 CONFIRMATIONAL MONITORING SCHEDULE <br />4-9 <br />4.6.3 REPORTING REQUIREMENTS <br />4-10 <br />4.7 DATA EVALUATION <br />4-10 <br />4.7.1 DATA VALIDATION <br />4-10 <br />4.7.2 EVALUATION MONITORING DATA MANAGEMENT AND EVALUATION <br />4-10 <br />4.7.3 PERFORMANCE MONITORING DATA MANAGEMENT AND EVALUATION <br />4-10 <br />4.7.4 CONFIRMATIONAL MONITORING DATA MANAGEMENT AND EVALUATION <br />4-11 <br />4.8 CONTINGENCY PLAN TRIGGERS <br />4-11 <br />4-11 <br />4.8.1 SHALLOW AQUIFER COMPLIANCE CRITERIA <br />4.8.2 DEEP AQUIFER COMPLIANCE CRITERIA <br />4-12 <br />' <br />4.9 CONTINGENCY PLAN <br />4-12 <br />5.0 Direct Contact Pathway <br />5-1 <br />5.1 OBJECTIVES <br />5-1 <br />5.2 INSPECTION PLAN <br />5-1 <br />5.2.1 INSPECTION CHECKLIST <br />5-2 <br />5.2.2 INSPECTION PROCEDURES <br />5-2 <br />5.2.3 REPORTING REQUIREMENTS <br />5-2 <br />5.3 COMPLIANCE MONITORING DURING CONSTRUCTION <br />5-3 <br />5.3.1 PROTECTION MONITORING <br />5-3 <br />5-3 <br />5.3.2 PERFORMANCE MONITORING <br />5.4 CONTINGENCY PLAN <br />5-4 <br />Everett l_andfMCP maker- final Compliance Monitoring and Contingency Plan <br />dots\Compliance Monitoring PIan1CMCP 11-10-OO.doc <br />docs\ j ompli Oce ElRMonitoring <br />FINAL - March 2001 <br />Page iii <br />
The URL can be used to link to this page
Your browser does not support the video tag.