Laserfiche WebLink
n <br />The City of Everett <br />The Floyd & Snider Team Everett Landfill/Tire Fire Site <br />6.4.1 SURFACE WATER <br />The average of the contaminant concentrations as measured at the two surface water <br />background locations will be subtracted from the contaminant concentrations measured at the <br />point of compliance sample. Any contaminants that are non -detects will be assumed to be <br />present at one-half the detection limit. Exceedance of the cleanup standard will occur if the <br />concentration at the compliance point exceeds cleanup standard after subtracting the average <br />background concentration from the compliance point concentration. <br />6.4.2 SWPPP <br />The SWPPP will be prepared incorporating the applicable requirements of the Cleanup Action <br />Plan and Consent Decree. Additionally, it will be prepared in accordance with the City of <br />Everett's Stormwater Management Manual. This manual is technically equivalent to Ecology's <br />Stormwater Management Manual. The City's Manual does not repeat all the information in <br />Ecology's Manual, but refers to Ecology's Manual where appropriate. <br />The SWPPP will include requirements for inspection and note standards of acceptance for best <br />management practices. Inspections will be conducted, evaluated and documented in <br />accordance with the SWPPP. <br />' 6.5 REPORTING REQUIREMENTS <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />The results of each semi-annual sampling event will be presented in an annual monitoring <br />report to Ecology. The annual monitoring report will include a summary of the data, a <br />determination of compliance or non-compliance in accordance with the evaluation methods <br />described in Section 6.4, and a copy of the laboratory data results and quality assurance <br />analyses. <br />Ecology will be notified within 7 days of any confirmed exceedance that triggers contingency <br />plans. <br />A copy of the SWPPP will be made available to Ecology upon its completion. The SWPPP will <br />be completed within 180 days after final adoption of the Cleanup Action Plan and Consent <br />Decree. Inspections and documentation required by the SWPPP will be reported and filed as <br />described in the SWPPP. <br />6.6 CONTINGENCY PLAN TRIGGERS <br />6.6.1 SURFACE WATER <br />An exceedance of the cleanup standard at the point of compliance, as determined by the <br />evaluation methods described in Sections 6.4.2 will initiate the applicable contingency plan. <br />docs jests Hance R doringt l ndf'iII\PDF maker - final Compliance Monitoring and Contingency Plan <br />dots\Compliance Monitoring PIan1CMCP 11-10-DO.doc <br />FINAL - March 2001 Page 6-3 <br />