My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3800 RIVERFRONT BLVD 2025-07-23
>
Address Records
>
RIVERFRONT BLVD
>
3800
>
3800 RIVERFRONT BLVD 2025-07-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2025 3:49:01 PM
Creation date
6/18/2025 10:18:28 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3800
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L� <br />The City of Everett <br />The Floyd & Snider Team Everett Landfill/Tire Fire Site <br />6.6.2 SWPPP <br />If any inspection conducted in accordance with the SWPPP finds a condition that could lead to <br />surface water or sediment contamination, contingency plans provided for in the SWPPP will be <br />initiated. <br />6.7 CONTINGENCY PLAN <br />6.7.1 SURFACE WATER SAMPLING <br />An exceedance of the cleanup standard at the compliance point initiates this contingency plan. <br />Data from the other five downstream samples will be evaluated to determine if a likely source <br />area could be identified. If the compliance point exceeds the cleanup standard, it is likely that at <br />least one other downstream sample point has an elevated concentration of the contaminant that <br />caused the exceedance. Inspection efforts will be concentrated in the area upstream of an <br />affected sample point. Inspections will look for leachate seeps, exposed refuse, or other <br />evidence of sources of contamination to surface water. Deficiencies will be corrected as <br />appropriate. ' <br />If no obvious source of contamination were observed, another surface water sampling event will <br />be conducted to determine if the contamination still exists. Additional upgradient sampling <br />points may be added to assist the investigation. This process will continue until the cleanup <br />standard is no longer exceeded, or until an upgradient, off -site source of the contaminant is <br />identified. Appropriate notifications will be made if the contaminant is found to be from an off - <br />site source. ' <br />6.7.2 SWPPP I <br />The SWPPP will include requirements for periodic inspections of applicable features included in <br />the SWPPP. Any inspection that noted a deficiency would initiate the corrective actions and <br />contingencies included within the SWPPP. Such contingencies typically include emergency spill <br />cleanup, maintenance, repair, and documentation. If it is determined that basic maintenance <br />and repair would not be adequate to correct the observed deficiency, then appropriate design by <br />a registered engineer in the State of Washington would be initiated. Upon completion of the <br />design and approval of the applicable regulatory agencies, the improvement would be <br />constructed. <br />�j <br />1 <br />1 <br />docs jests Hance o Everett LandfiMCP maker -final Compliance Monitoring and Contingency Plan <br />docslCompliance Monftoring PIan\CMCP 11-10-DO.doc <br />FINAL - March 2001 Page 6-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.