My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3800 RIVERFRONT BLVD 2025-07-23
>
Address Records
>
RIVERFRONT BLVD
>
3800
>
3800 RIVERFRONT BLVD 2025-07-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2025 3:49:01 PM
Creation date
6/18/2025 10:18:28 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3800
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11. Site Information <br />Site Project Name: Riverfront Commercial <br />Street Address or Location Description: East of S 3rd Ave at East end of 41 st St West of Snohomish River <br />City: Everett <br />Latitude: 47.966036 <br />County: Snohomish <br />Longitude:-122.192913 <br />Type of Construction Activity: <br />Residential <br />© Commercial <br />Industrial <br />Highway or Road (city, county. state) <br />Utilities (specify): <br />Other (specify): <br />Site Acreage <br />Total site/project size <br />Zip Code: 98201 <br />70 acres <br />Total disturbed area: 70 acres <br />Total area of soil disturbance for your siteiprojecl over the life of <br />the project. Include grading equipment staging, excavation. <br />borrow pit, material storage areas, dump areas. haul roads, side - <br />cast areas, off -site construction support areas, and a// other soil <br />disturbance acreage associated with the project. <br />Will 1,000 cubic yards or more of poured concrete or recycled concrete be used over the Yes N No <br />life of the project? <br />Estimated project start date: 8/112018 Estimated project completion date: 9/1/2018 <br />Other Permits <br />None <br />IV. Existing Site Conditions <br />1. Are you aware of contaminated soils on this site? Yes N No <br />2. Are you aware of groundwater contamination located within the site boundary? Yes N No <br />3. If you answered yes to question 1 or 2, will any contaminated soils be distrubed or will any nYes No <br />contaminated groundwater be discharged due to the proposed construction activity? <br />If yes, please provide detailed information (as known and readily available) on the nature and extent of the contamination <br />(concentrations, locations, and depth) as well as pollution prevention and/or treatment Best Management Practices <br />(BMPs) proposed to control the discharge of soil and/or groundwater contaminants in stormwater. This should include <br />information that would be included in related portions of the Stormwater Pollution Prevention Plan (SWPPP) that describe <br />how contaminated and potentially contaminated construction stormwater and dewatering water will be managed. You <br />may attach this information separately, if needed <br />V. Stormwater Pollution Prevention Plan (SWPPP) <br />You must develop a SWPPP prior to starting construction. Do not submit your SWPPP with your application. If you <br />answered yes to the questions in Part IV, please submit the information that would be included in related portions of the <br />SWPPP that describe how contaminated and potentially contaminated construction stormwater and dewatering water will <br />be managed. <br />VI. Best Management Practices (BMPs) <br />You must use the BMPs listed in the Stormwater Management Manual for Western Washington or the Stormwater <br />Management Manual for Eastern Washington or other manuals approved by Ecology. Alternatively, you may use <br />demonstrably equivalent BMPs on the basis of permit condition S9.C.4. If you intend to use a BMP at your site that is not <br />included in these manuals, but that you believe meets the definition of a demonstrably equivalent BMP, you must notify <br />the appropriate regional office. (See Definitions in the Construction Stormwater General Permit).' <br />http://ecology.wa.gov/Regulations-Permits/Permits-certifications/Stormwater-general-permits/Construction-stormwater- <br />permit#contacts <br />Page 2of4 <br />1 <br />r--I <br />LJ <br />1 <br />IJ <br />1 <br />1 <br />1 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.