Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />*lVote th l if you receive permit coverage without indicating the preference for a do râ–ºstrably equivalent BMP and later cc to use one, you must <br />provide L cology with notice of the selection of an equivalent BMP no less that, 60 c s before the intended use of the equi. 'it BMP. <br />VII. Discharge/Receiving Water Information <br />Indicate whether your site's stormwater and/or dewatering water c- d enter surface waters, directly a/or indirectly: <br />© Water will discharge directly or indirectly (through a storm drain , -stem or roadside ditch) into one c- more surface <br />waterbodies (wetlands, creeks, takes, and all other surface water: and water courses). <br />If your discharge is to a storm sewer system, provide the name of the operator of the storm sewer <br />system: <br />City of Everett <br />0 Water will discharge to ground with 100% infiltration, with no potential to reach surface waters under any conditions. <br />If your project includes dewatering, you must include dewatering plans and discharge locations in your site Stormwater <br />Pollution Prevention Plan. <br />Location of Discharge into Surface Waterbody <br />Outfall Outfall Description Surface Waterbody <br />Number Name <br />1 Snohomish River Snohomish River <br />Vill. State Environmental Policy Act (SEPA) <br />Outfall Type Latitude Longitude <br />Surface Water Body 47.965346-122.189094 <br />This Notice of Intent (NOI) is incomplete and cannot be approved until the applicable SEPA requirements under Chapter <br />197-11 WAC are met. <br />Who is the SEPA lead agency on your site? Snohomish County <br />Has the SEPA lead agency issued a final decision on your checklist? XX Yes ONo Exempt <br />If No: The NOI is incomplete. Ecology will hold the application until a final SEPA decision is made or the <br />Construction Stormwater NOI public comment period ends, whichever is later. You must notify Ecology once the <br />lead agency has issued a determination. <br />If Yes: Type of SEPA decision issued: EIS <br />Date of final SEPA decision: 6/11 /2008 <br />Date when all SEPA-related comment & appeal periods ended or will end: 2/4/2008 <br />If Exempt: <br />Watershed Restoration & Fish Habitat Enhancement Exemption (RCW 43.21C.0382). <br />Infill Development Exemption (RCW 43.21 C.229). <br />Planned Action Exemption (RCW 43.21 C.031). <br />0 Categorical Exemption. Under what section of the SEPA Rule (WAC 197-11-800) is it exempt? <br />Section: <br />IX. Public Notice <br />You must publish a public notice at least once a week for two consecutive weeks with seven days between <br />'publications, in at least a single newspaper of general circulation in the county in which the construction is to take place. <br />Ecology cannot grant permit coverage sooner than the end of the 30-day public comment period. which begins on the <br />date of the second public notice. <br />Newspaper Name First Public Notice Date Second Public Notice Date <br />Everett Herald 4/26/2018 5/3/2018 <br />m X. Certification of Permittees <br />Page 3 of 4 <br />1 <br />