My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
202 ALDER ST 2025-08-25
>
Address Records
>
ALDER ST
>
202
>
202 ALDER ST 2025-08-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 7:58:10 AM
Creation date
6/18/2025 10:59:23 AM
Metadata
Fields
Template:
Address Document
Street Name
ALDER ST
Street Number
202
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed View Ridge Subsurface Exploration, Geologic Hazards, Infiltration Potential, <br /> Elementary School Replacement and Preliminary Geotechnical Engineering Report <br /> Everett, Washington Project and Site Conditions <br /> 3.1 Exploration Borings <br /> The exploration borings were completed by advancing hollow-stem auger tools with a track- <br /> mounted drill rig. During the drilling process, samples were obtained at generally 2.5- to <br /> 5-foot-depth intervals. The exploration borings were continuously observed and logged by a <br /> representative from our firm. The exploration logs presented in the Appendix are based on the <br /> field logs, drilling action, and inspection of the samples secured. <br /> Disturbed but representative samples were obtained by using the Standard Penetration Test <br /> (SPT) procedure in accordance with American Society for Testing and Materials <br /> (ASTM):D 1586. This test and sampling method consists of driving a standard, 2-inch <br /> outside-diameter, split-barrel sampler a distance of 18 inches into the soil with a 140-pound <br /> hammer free-falling a distance of 30 inches. The number of blows for each 6-inch interval is <br /> recorded, and the number of blows required to drive the sampler the final 12 inches is known <br /> as the Standard Penetration Resistance ("N") or blow count. If a total of 50 is recorded within <br /> one 6-inch interval, the blow count is recorded as the number of blows for the corresponding <br /> number of inches of penetration. The resistance, or N-value, provides a measure of the <br /> relative density of granular soils or the relative consistency of cohesive soils; these values are <br /> plotted on the attached exploration boring logs. <br /> The samples obtained from the split-barrel sampler were classified in the field and <br /> representative portions placed in watertight containers. The samples were then transported to <br /> our laboratory for further visual classification and laboratory testing, as necessary. <br /> 4.0 SUBSURFACE CONDITIONS <br /> Subsurface conditions at the project site were inferred from the field explorations accomplished <br /> for this study, visual reconnaissance of the site, and review of selected applicable geologic <br /> literature. Because of the nature of exploratory work below ground, extrapolation of <br /> subsurface conditions between field explorations is necessary. It should be noted that differing <br /> subsurface conditions may sometimes be present due to the random nature of deposition and <br /> the alteration of topography by past grading and/or filling. The nature and extent of any <br /> variations between the field explorations may not become fully evident until construction. <br /> September 22, 2010 ASSOCIATED EARTH SCIENCES, INC. <br /> BWG/tb-KE100255A2-Project.s1201002551KEIWP Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.