My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
202 ALDER ST 2025-08-25
>
Address Records
>
ALDER ST
>
202
>
202 ALDER ST 2025-08-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 7:58:10 AM
Creation date
6/18/2025 10:59:23 AM
Metadata
Fields
Template:
Address Document
Street Name
ALDER ST
Street Number
202
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed View Ridge Subsurface Exploration, Geologic Hazards, Infiltration Potential, <br /> Elementary School Replacement and Preliminary Geotechnical Engineering Report <br /> Everett, Washington Project and Site Conditions <br /> 4.1 Stratigraphy <br /> Surficial Topsoil <br /> Those exploration borings not located in paved areas generally encountered approximately <br /> 6 inches of grass and topsoil. Topsoil is not suitable for structural support, and should be <br /> stripped from structural areas. Excavated topsoil may be suitable for reuse in landscape areas. <br /> Existing Paving <br /> Existing paving was encountered at one of the boring locations. The asphalt paving was <br /> approximately 3 inches thick at the location of EB-7. Existing paving should be removed from <br /> below planned building areas. <br /> Fill <br /> Existing fill was encountered in two of our explorations to maximum depths of approximately <br /> 10 feet below the existing ground surface. Possible existing fill was encountered in two <br /> additional explorations. It should be noted that some of the existing fill appears to consist of <br /> soils derived on-site and are difficult to distinguish from intact site soils in exploration borings. <br /> Typically, such determinations are much easier in open excavations such as those that are made <br /> at the time of construction. <br /> Existing fill is not suitable for structural support without remedial preparation as described in <br /> the "Site Preparation" section of this report. Existing fill should be replaced below planned <br /> building areas, and should be re-worked under paving. Excavated existing fill material is <br /> suitable for reuse in structural fill applications if it is free of excessive organic material and <br /> other deleterious materials and is allowed by the project plans and specifications. <br /> Advance Outwash <br /> Below the surficial fill where it was present, all of the exploration borings encountered dense <br /> sand with few silt and silt stringers interpreted as Vashon advance outwash sediments. <br /> Advance outwash was deposited at the base of an advancing glacier, and was subsequently <br /> compacted by the weight of the overlying glacial ice. Advance outwash deposits typically <br /> exhibit gradational stratification, including stringers consisting of silt and/or silty sand. Such <br /> stratification has the potential to limit advance outwash sediments from performing well as an <br /> infiltration receptor. The construction of pit drains, as discussed in this report, penetrates finer <br /> strata and substantially improves the ability of advance outwash to serve as an infiltration <br /> receptor. Excavated advance outwash sediments are expected to be suitable for reuse in <br /> September 22, 2010 ASSOCIATED EARTH SCIENCES, INC. <br /> BWG/tb-KE100255r12-Prof ects120100255IKEIWP Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.