Laserfiche WebLink
MINUTE MAN ANCHORS, INC. <br /> INSTRUCTION FOR USING MINUTE MAN STABILIZING DEVICE <br /> Minute Man stabilizing devices are designed for use with Minute Man anchors and intended to <br /> laterally restrict movement of the anchor through the soil. <br /> Before Pretensioning After Pretensioning <br /> iF i . <br /> 4" II! <br /> 7 2"for 4"disk anchor <br /> Strap ; 4"for 6"to larger disk anchor <br /> Plat ,,, <br /> Stabilizer Plat Stabilizer Plat <br /> Ground Anchor—► Ground Anchor —► <br /> J <br /> 10° f <br /> _► <br /> 4. Place a stabilizer plate to the inside of the anchor shaft(side of <br /> 1. Place the anchors approximately four inches to the inside shaft toward center of house)and the distance indicated from the <br /> of the exterior wall line of the home or a sufficient distance shaft. <br /> to avoid interference with the skirting (see above) <br /> y,Hold the anchor at an angle of approximately 10 degrees 5. Drive the stabilizer plate into the ground until the top of the plate is <br /> 9 pp Y 9 1"below the surface of the ground. <br /> off of vertical so that the head of the anchor is just outside <br /> the sidewall (see above) 6.Install the anchor to its full depth. <br /> 3.Install the anchor to a depth of approximately one-third 7. Pretension the anchor by pulling it up to the stabilizer plate. Pull <br /> (1/3)the anchor length. the anchor approximately IA inch more while it is in contact with the <br /> plate using the strap and take-up bolt to move the anchor head. <br /> Vertical Tension <br /> ��Horizontal Tension <br /> \�Ull11U'�11111U11111la <br /> INSTALLATION INSTRUCTIONS <br /> r�; ��p >444 U p Drill 5/8" diameter hole 5 1/2" deep, in center of <br /> +` ` anchor location, for pilot stud. Insert pilot stud <br /> into hole. <br /> Drill two -3/4" diameter holes in rock at 45 degree <br /> angles, using anchor head as a locating guide. <br /> Place rod through top of(1) square tube and into <br /> Il <br /> hole. Drive rod to desired depth. (Rod must be <br /> driven into rock at least 80% of its length in order <br /> P 0 to achieve minimum allowable pullout resistance.) <br /> Place second rod through top of remaining tube. <br /> Installation Drive rod to desired depth to lock. <br /> Maximum pullout resistance is developed when <br /> Instructions anchor head is low as possible and ground <br /> for surface is solid rock. Distance from square tubing <br /> Cross Drive to rock surface should not exceed 1". <br /> Rock Anchor <br /> 2. <br />