Laserfiche WebLink
EVERETT <br />WASHINGTON <br />July 15, 2021 <br />Mr. Ram Nehara <br />4735 Bayview Lane <br />Everett, WA 98203 <br />CITY OF EVERETT <br />Permit Services <br />Email Address: ramnehral@gmail.com <br />RE: Owner: Ram Nehara <br />Job Address: 4735 Bayview Lane <br />Plan Check Number: CW1910-004, Revision after Issuance - First Building Review <br />Dear Mr. Nehara, <br />The proposed project has been reviewed for compliance with the provisions of the building codes <br />adopted and amended by the state of Washington and the city of Everett. The comments below <br />must be addressed before a permit can be issued. These comments address building issues only. <br />Additional comments may be issued by the Public Works, Planning, and Fire departments. <br />Code citations provided in the following review comments reference the Everett Municipal Code <br />(EMC), the 2018 International Residential Code (IRC), 2018 International Building Code (IBC), and <br />the 2018 Washington State Energy Code (WSEC). Amendments to the adopted building codes by <br />Washington Administrative Code (WAC) Title 51 are incorporated into the referenced code citations. <br />Citations provided in the comments reference the IRC unless noted otherwise. The codes, <br />including WAC amendments where applicable, can be viewed using the following links: <br />• EMC: <br />https://everett.municipal.codes/ <br />• 2018 IRC: <br />https://up.codes/viewer/washington/wa-residential-code-2018 <br />• 2018 IBC: <br />https://up.codes/viewer/washington/wa-building-code-2018 <br />• 2018 WSEC: <br />https://uo.codes/viewer/washington/wa-eneray-code-residential-provisions-2018 <br />• WAC: <br />https://apes.leg.wa.gov/wac/default.asi)x?cite=51 <br />In order for the processing of your application to continue, the following documentation shall be <br />submitted to Permit Services for review: <br />a. Itemized letter addressing the comments provided below. <br />b. Two complete sets of revised construction drawings. <br />c. Two copies of supplemental structural calculations. <br />Submittal documents should contain sufficient information and detail to review the proposed project <br />for compliance with the adopted building codes. Upon submittal of the revised documents, your <br />application will be given priority and the review will recommence. <br />Page 1 of 3 <br />