Laserfiche WebLink
• • <br /> Port ofEVERETT <br /> Transmittal <br /> To: City of Everett—Building Department <br /> 3200 Cedar St. <br /> Everett, WA 98201 <br /> From: Brandon Whitaker <br /> Date: September 29,2022 <br /> Re: Building Permit—Tenant Improvements permit application for: "South Fork Bakery <br /> Tenant Improvements" <br /> Please find attached the following: <br /> Qty. Description <br /> 1 Building Permit—Tenant Improvements application 10�3 <br /> 1 Memorandum—South Fork Bakery Tenant Improvements—Temporary Heating <br /> Approach V <br /> 2 Port of Everett Parcel A8—South Fork Tenant Improvements: full size drawings [ <br /> 2 DM7 Design—South Fork Baking Company:full size drawings <br /> 2 Structural Building Calculations <br /> Remarks: <br /> To Whom It May Concern: <br /> Per our past discussions please find attached the above referenced items for the South Fork Bakery <br /> Tenant Improvements. The Port's contractor will be working off both drawing sets for the work. The <br /> Port understands this is not typical, but the work shown on both plan sets will be under one tenant <br /> improvement permit. Please let me know if you have any questions or clarifications at your earliest <br /> convenience. I may be reached at 425-508-6627 and bwhitaker(c�portofeverett.com. Thank you. <br /> Sincerely, <br /> Brandon M. Whitaker <br /> E&P Transmittal <br />