My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1410 SEINER DR SOUTH FORK BAKING COMPANY 2025-08-05
>
Address Records
>
SEINER DR
>
1410
>
SOUTH FORK BAKING COMPANY
>
1410 SEINER DR SOUTH FORK BAKING COMPANY 2025-08-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2025 9:54:40 AM
Creation date
6/18/2025 2:28:42 PM
Metadata
Fields
Template:
Address Document
Street Name
SEINER DR
Street Number
1410
Tenant Name
SOUTH FORK BAKING COMPANY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> Drew Martin <br /> From: Drew Martin <br /> Sent: Friday,June 2, 2023 4:13 PM <br /> To: Lisa Cassaday <br /> Subject: City of Everett Permit Services: 1410 Seiner Drive, Suite 103 (M2305-055) - Second <br /> Building Review <br /> Attachments: M2305-055_R1.pdf <br /> Hello, Lisa <br /> We have completed a second review of this project. However,the previously issued comments in the First <br /> Review letter have generally not been addressed. The previous letter is attached for your convenience. <br /> Comments supplementing the previous comments are provided below;the previous comments should be <br /> addressed as indicated. Revised construction-level documents should be submitted for review. Two complete <br /> sets of the revised drawings should be submitted to replace the previously submitted drawing sets. The <br /> resubmittal documents should include an itemized response letter clarifying how the review comments below <br /> have been addressed. <br /> Supplemental Review Comments: <br /> 1. The structural modifications are not included in Permit No. B2210-001 as specified in the response. In <br /> addition, it is anticipated that modifications to the roof system may be required pending an analysis as <br /> addressed in Comment 3. <br /> 2. The Type I hood is still included in the drawings. Note that the response incorrectly refers to Type II <br /> hoods. Type I hoods require separate permit application. <br /> 3. The original roof design under Permit No. B2107-074 does not include the weight of the mechanical <br /> units in the design. Calculations substantiating the roof framing to support the unit weights in <br /> additional to dead and snow loading are required. If modifications to the roof structure are required, <br /> these must be submitted under a separate permit application or as a revision to B2107-074. Note that <br /> Permit No. B2209-019 and B2210-001 were also reviewed and do not address this issue. <br /> 4. Design and details for the suspended units are not included in the associated Building permits and <br /> must be addressed in the Mechanical permit application. <br /> Review of your project will be performed in the order received once the required documentation has been <br /> submitted. Please let me know if you have questions. <br /> Drew Martin, P.E.,S.E. <br /> L. <br /> - Associate Engineer—Commercial Plans Examiner I Permit Services <br /> 425.257.8810 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> EVERETT Phone Hours: M/W/T:8 am -12 pm & 1 pm—3 pm;Tu: 1:00pm-3:00pm <br /> everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.