My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1410 SEINER DR SOUTH FORK BAKING COMPANY 2025-08-05
>
Address Records
>
SEINER DR
>
1410
>
SOUTH FORK BAKING COMPANY
>
1410 SEINER DR SOUTH FORK BAKING COMPANY 2025-08-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2025 9:54:40 AM
Creation date
6/18/2025 2:28:42 PM
Metadata
Fields
Template:
Address Document
Street Name
SEINER DR
Street Number
1410
Tenant Name
SOUTH FORK BAKING COMPANY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• I <br /> 4 <br /> • <br /> P• ort of <br /> • EVERETT <br /> MEMORANDUM <br /> TO: Tony Lee, City of Everett Building Official <br /> FROM: Brandon Whitaker, Project Manager <br /> DATE: September 29, 2022 <br /> SUBJECT: South Fork Bakery Tenant Improvements—Temporary Heating Approach <br /> Per our conversation regarding the future tenant improvements project located at 1410 <br /> Seiner Drive — Suite 103 for South Fork Bakery, allow this Memorandum to explain the <br /> temporary heating setup the project will initially have as it relates to achieving Temporary <br /> Certificate of Occupancy at project end. <br /> Due to supply chain issues, the final designed HVAC units are not available until Q1 <br /> 2023. This delay does not adhere to our tenant's schedule for opening business. In the <br /> meantime, the Port's contractor plans to install temporary heating units to allow for <br /> business operations to be conducted in the interim. <br /> Details on this temporary system include: <br /> • These two temporary units (Blaze 200 DG Turbo) will provide up to 350,000 <br /> BTUH (the final units will provide 310,000 BTUH) <br /> • The temporary units weigh a combined 800 lbs., compared to the final units <br /> weighing a total of 2,362 lbs. <br /> • The temporary units will be secured in place to the unit curbs and connected to <br /> the new HVAC ducting until the final units arrive next year and are installed. <br /> If you should have any questions or comments, please let me know. Thank you. <br /> PND Invoice May—June: September 16, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.