Laserfiche WebLink
WATERFRONT PLACE CENTRAL <br />PORT OF EVERETT — PSA 1-2015-005 <br />A17 PROJECT SITE — HH SUMMARY <br />PND No. 154016 — 017.01 <br />Sub -Basins 3 is a total of SF or approximately 0.19 Acres of area from the A8 site that discharge to <br />the FHA system. <br />• Sub -Basin 4 is accounted for in Sub -Basin Al and Al from the 2016 analysis. <br />The proposed developed area of A8 that is contributing the FHA system is less than the 2016 area allotted in <br />FHA Sub -Basin A14 and therefore the prosed site is in compliance with the 2016 conveyance, treatment and <br />backwater analysis for the FHA system. <br />P JINJIDI <br />