My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3910 RIVERFRONT BLVD BLDG A 2025-08-15
>
Address Records
>
RIVERFRONT BLVD
>
3910
>
BLDG A
>
3910 RIVERFRONT BLVD BLDG A 2025-08-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 3:32:27 PM
Creation date
6/20/2025 10:55:49 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3910
Tenant Name
BLDG A
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1588
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pronouns:she, her, hers <br /> GLUMAC I C.503.730.6354 <br /> From: MacKenzie, Katie <br /> Sent: Friday,July 15, 2022 9:35 AM <br /> To: 'Tony Lee'<TLee@everettwa.gov> <br /> Cc: Moyano, Dione<DMoyano@glumac.com> <br /> Subject: RE: [EXTERNAL] Building A-Generator Exhaust <br /> Hi Tony, <br /> Follow up to your questions. See highlighted below. <br /> Katie MacKenzie, PE <br /> Project Manager/Energy Engineer <br /> Pronouns:she, her,hers <br /> GLUMAC I C.503.730.6354 <br /> From: MacKenzie, Katie <br /> Sent:Thursday,July 7, 2022 1:46 PM <br /> To:Tony Lee<TLee@everettwa.gov> <br /> Cc: Moyano, Dione<DMoyano@glumac.com> <br /> Subject: RE: [EXTERNAL] Building A-Generator Exhaust <br /> Hi Tony, <br /> Thanks so much for the quick reply.Some answers in red below. <br /> Katie MacKenzie, PE <br /> Project Manager/Energy Engineer <br /> Pronouns:she, her, hers <br /> GLUMAC C.503.730.6354 <br /> From:Tony Lee<TLee@everettwa.gov> <br /> Sent:Thursday,July 7, 2022 1:30 PM <br /> To: MacKenzie, Katie<kmackenzie@glumac.com> <br /> Subject: RE: [EXTERNAL] Building A-Generator Exhaust <br /> D CAi1TrON This emaif originated from,an external-sende"r Verifythesource before opening[inks„or attachments_ Q:. <br /> Hi Katie, <br /> Just some thoughts: <br /> • Is the door a 2x to allow for large equipment passage?Correct, large enough to replace any of the (electrical) <br /> equipment in this room <br /> • Will this interior area be positively pressurized under normal conditions?Yes,the electrical room is positively <br /> pressurized with continuously ventilation,as required by the Consent Decree for this project. <br /> • Are both leaves operable or is one secured unless needed?Yes,the door leaf closer to the generator exhaust <br /> can (and will) be secured. <br /> I think this will help even greater. <br /> • Can we make the doors 20-minute rated assemblies(meaning could they be installed as smoke-and-draft- <br /> control doors as required for corridors)?The gasketing for the door is currently 20-minute rated. Can you <br /> confirm if the door itself also needs to be rated? <br /> 3/ � <br />
The URL can be used to link to this page
Your browser does not support the video tag.