Laserfiche WebLink
AutoZone is sending a Bosch B8512G Panel, B208 Expansion Module, B444-V Cell Module and a B600 Zonex Retrofit module <br /> to the store. <br /> Everon will put the system on test with the instructions above and complete the following: <br /> • Replace the existing COMBO Burg/Fire panel with the the customer supplied B8212G, B208, B444-V and B600 <br /> • Verify that there is a network wire run from the COMBO Burg/Fire panel to the AutoZone network switch. <br /> o If there is no network cable between the panel and switch, Everon will run a cat5 cable (cable provided by Everon), <br /> terminate and install in the switch port given by the AutoZone central station associate. <br /> • We will remove the telephone line from the panel. Panel will be network primary with cellular backup. <br /> • Replace both Bosch panel batteries, provided by Everon. If there is only one battery currently, upgrade to two batteries, <br /> per AutoZone's Spec. <br /> • After completion of the panel replacement, network cable, and battery, contact the AutoZone central station to confirm it is <br /> working and do a test of the entire system. <br /> o If there are any deficiencies in the system, note it in the install comments, notify the AutoZone associate and <br /> receive a PO from them to replace the deficient item. <br /> • Take pictures of the network connections, panel, cell module and new batteries. <br /> • Upon completion, contact the AutoZone Central station and check out with them. <br /> o Clean the entire work area. Promptly remove from site all tools, equipment and excess materials <br /> All labor, materials provided by Everon and workmanship is to be guaranteed for a minimum of one year. <br /> Exclusions: <br /> • All work is to be completed off of a 12 foot ladder. If it is found that a 12 foot ladder is not tall enough, a lift will need to be <br /> ordered and the site rescheduled. The lift and an additional trip charge will be done as a change order <br /> • Labor pricing has been estimated on performing all work in one phase with no delays caused by the customer. Labor <br /> pricing may vary if work is performed in additional phases or there are delays over 30 minutes caused by the customer <br /> and will be subject to a change order. <br /> • 120VAC electrical requirements shall be provided and installed by others. <br /> • Any field devices that are not compatible with the B-Series panels will need to be upgraded on a change order. <br /> • ADT Commercial will be providing and installing cabling based on common cabling requirements (not to include full <br /> conduit or any type of specialty cabling/conduit requirements other than basic cabling. If conduit is found to be needed, the <br /> site will need to be rescheduled and a change order will be provided for the necessary conduit. <br /> • Any physical guard services required for securing the facility for any reason will be the responsibility of AutoZone. <br /> • Pricing is for AutoZone stores only. No distribution centers, offices or support facilities <br /> Page 62 of 100 Tech Initials: <br />