My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
916 PACIFIC AVE BASE FILE 2025-07-15
>
Address Records
>
PACIFIC AVE
>
916
>
BASE FILE
>
916 PACIFIC AVE BASE FILE 2025-07-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2025 11:24:30 AM
Creation date
6/23/2025 1:49:12 PM
Metadata
Fields
Template:
Address Document
Street Name
PACIFIC AVE
Street Number
916
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FLEXHEAD Flexible Sprinkler Connections <br /> Z ANVIL <br /> ADOXXBKT3 Adjustable Open Hub Bracket (ADO) <br /> Installation of FlexHead Commercial Ceiling Flexible Sprinkler Drop System <br /> Recommend the use of proper PPE for installation.ADOXX- The ADOXXBKT3 is pre-assembled at FM UL <br /> BKT3 is approved for use with the standard FlexHead°and center tile position. (See below for APPBOVm <br /> SuperFlex'M Flexible Sprinkler Hose in accordance to NFPA 13, additional installation configurations) <br /> 13D, & 13R for use in wet and dry sprinkler system.The AD016BKT3&AD024BKT3 UL Listed and FM Approved. <br /> Standard&SuperFlex'M Flexible sprinkler hoses are UL AD030BKT3&AD048BKT3 FM Approved. <br /> approved for limited flexibility and are intended for direct <br /> sprinkler connection. <br /> FlexHead° <br /> y Standard Tall FlexHead° <br /> r Su erFlex'" <br /> 2024T,2036T,2048T,2060T, __� Standard Tall Elbow p <br /> 2072T,20XXH,20XXHE,20XXI � 2024ET,2036ET,2048ET,2060ET,2072ET 2036SF,2048SF,2072SF <br /> T Bar Ceiling Fig.1 31nstallation <br /> AD0 Bracket Fig.3a <br /> Grid Installation <br /> The ADO bracket is designed for Maneuver the flexible sprinkler <br /> use on ceiling grids conforming to drop from the branch to the ADO <br /> ASTM C 635*. bracket. Review that the hose <br /> Locate the center of the length, number of bends, and <br /> ceiling tile marking, align the bend radius are applicable for <br /> offset screw with that marking for true center of tile installation. the installation per NFPA <br /> Insert one bracket leg at a time, applying a downward pressure guidelines. (See corresponding / <br /> on the bracket leg and T-Bar. Place the second leg on the hose submittal for installation <br /> T-Bar and repeat process. (Fig. 1) information.) <br /> The ADO bracket has an open <br /> 2FlexHead Flexible ig.2 hub for ease of installation. <br /> Hose Installation Open the hinge apparatus by y <br /> turning the locking shaft'/a turn. Fig.3b <br /> A. For threaded fitting branch Slide the flexible hose drop into <br /> connection:Apply TeflonR tape or the hub. Ensure the drop is vertical, and the SS Flexible®hose <br /> pipe sealant to the 1" NPT _ is not applying a substantial moment on the bracket causing <br /> thread. Install into branch outlet. sprinkler misalignment. Latch the hinge door closed and adjust <br /> Tigthen the hose using the pipe the sprinkler drop for desired ceiling height.Tighten the set <br /> section, never apply a wrench to Do not wrench on 3 <br /> the braided hose when installing. braided hose screw till hand tight plus /a turn,(130 in Ibs).(Fig.3a and 3b) <br /> B. For groove connection follow the grooved coupling manufac- Install desired sprinkler head, per the manufacturer's <br /> turer's installation instructions. installation instructions. <br /> C. For SLT connection follow Gruvlok°installation instructions, <br /> "Fig 7074SLT SlideLOK°Ready for Installation Cap&Fitting Instructions". <br /> The FlexHead connection can be installed in any direction from <br /> the branch. Ensure the hose is allowed at least one bend per <br /> installation to allow for seismic movement. (See fiction Loss <br /> Chart on Page 3 for details) <br /> Installation Configurations Installation Complete <br /> 24"Tile—24/4-Quarter Mark Position 14'/2"Wood Stud-Center Position* <br /> U.S and International Patent Pending: #6,123,154,#6,119,784,#6,752,218,#7,032,680,#6,488,097 <br /> 20XXT,220XXET,20XXH,20XXHE,20XXI,with ADOXXBKT3 Bracket has not been evaluated by UL. <br /> 'Intended for use on ASTM C 635 intermediate or heavy duty ceilings systems installed in accordance to ASTM C 636. <br /> -FM Approved,Installation has not been evaluated by UL. <br /> FP-8.18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.