My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 4101-25
>
Ordinances
>
Ordinance 4101-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2025 3:28:15 PM
Creation date
6/24/2025 3:16:06 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
4101-25
Date
6/18/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EVERETT 2044 <br />COMPREHENSIVE PLAN <br /> <br /> <br /> <br /> 6/17/2025 <br />COMPREHENSIVE PLAN <br />TRANSPORTATION ELEMENT <br /> Page 118 <br />BICYCLE PROJECTS <br />PROJECT ID PROJECT NAME DESCRIPTION MODE COST 1 <br />FPB -09 <br />Hewitt <br />Avenue/Chestnut <br />Street/Riverfront Blvd <br />bicycle connection <br />Create a bicycle facility along these <br />routes to connect the planned <br />California Street facilities to the <br />Riverfront. <br />Bicycle 124,000 <br />T1-R Summit Avenue bicycle <br />facility <br />Add a signed bicycle route to the <br />existing roadway, Tier 1 project in <br />BMP <br />Bicycle 47,000 <br />T3-C Ross Avenue bicycle <br />facility <br />Add a bicycle lane to the existing <br />roadway, Tier 3 project in BMP Bicycle 34,000 <br />T3-H Mukilteo Lane bicycle <br />facility <br />Add a bicycle lane to the existing <br />roadway along Mukilteo Lane from <br />1st Street to W Mukilteo boulevard, <br />Tier 3 project in BMP. <br />Bicycle 26,000 <br />T3-W Seaway Boulevard <br />bicycle facility <br />Add a bicycle lane to the existing <br />roadway, Tier 3 in BMP Bicycle 1,520,420 <br />Bicycle Project Total $38,523,000 <br /> <br />PEDESTRIAN PROJECTS <br />PROJECT ID PROJECT NAME DESCRIPTION MODE COST 1 <br />FPP -02 Smith Avenue Sidewalk Add a Sidewalk to the existing <br />roadway, Tier 2 project in BMP Pedestrian $438,000 <br />P07 <br />Casino Road & 5th <br />Avenue W Pedestrian <br />Safety <br />At the traffic signal, install <br />accessible pedestrian pushbuttons, <br />flashing yellow left turn phasing <br />that operates in red when a <br />pedestrian presses the pushbutton, <br />fiber, and cameras. Install lighting. <br />Pedestrian $1,126,700 <br />P12 N. Broadway <br />Pedestrian Bridge Pedestrian Bridge Pedestrian $12,400,000 <br />P19 <br />West/East Marine View <br />Drive Pedestrian <br />Improvements <br />Improve safety and connectivity for <br />pedestrians Pedestrian $500,000 <br />P09 East Grand Walkway <br />Connection <br />Improve safety and connectivity for <br />pedestrians Pedestrian $850,000 <br />P16 Silver Lake Road -121st <br />St. SE Ped. Improv. <br />Improve safety and connectivity for <br />pedestrians Pedestrian $1,600,000 <br />P15 Pigeon Creek No. <br />1/BNSF Crossing <br />Improve safety and connectivity for <br />pedestrians Pedestrian $925,000
The URL can be used to link to this page
Your browser does not support the video tag.