My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 4101-25
>
Ordinances
>
Ordinance 4101-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2025 3:28:15 PM
Creation date
6/24/2025 3:16:06 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
4101-25
Date
6/18/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EVERETT 2044 <br />COMPREHENSIVE PLAN <br /> <br /> <br /> <br /> 6/17/2025 <br />COMPREHENSIVE PLAN <br />TRANSPORTATION ELEMENT <br /> Page 117 <br />BICYCLE PROJECTS <br />PROJECT ID PROJECT NAME DESCRIPTION MODE COST 1 <br />T1-F1 Federal Ave (North) <br />bicycle facility <br />Add a Bike Boulevard to the existing <br />roadway, Tier 1 project in BMP Bicycle 80,700 <br />T1-F9 52nd St SE bicycle <br />facility <br />Add a Bike Boulevard to the existing <br />roadway, Tier 1 project in BMP Bicycle 9,600 <br />T1-S Harrison Avenue <br />bicycle facility <br />Add a bicycle facility to the existing <br />roadway, Tier 1 project in BMP Bicycle 47,000 <br />T1-W Kasch Park Road <br />bicycle facility <br />Add a bicycle lane to the existing <br />roadway, Tier 1 project in BMP Bicycle 35,000 <br />T2-V SE 75th Street to <br />Hamlet -Gold Trail <br />Add a bicycle boulevard to the <br />existing roadway, Tier 2 project in <br />BMP <br />Bicycle 90,800 <br />T3-F Colby Avenue bicycle <br />facility <br />Add a bicycle lane to the existing <br />roadway, Tier 3 project in BMP Bicycle 4,653,000 <br />T3-O Pecks Drive bicycle <br />facility <br />Add a Shared Route to the existing <br />roadway, Tier 3 project in BMP Bicycle 23,000 <br />FPB -01 Chestnut Street bicycle <br />facility <br />Add a bicycle facility to the existing <br />roadway Bicycle 532,300 <br />FPB -02 Everett Avenue Bicycle <br />Facility Add a bicycle facility Bicycle 75,400 <br />T1-F6 46th St SE bicycle <br />facility <br />Add a Bike Boulevard to the existing <br />roadway, Tier 1 project in BMP Bicycle 7,800 <br />T2-F Brookridge Boulevard <br />bicycle facility <br />Add a bicycle lane to the existing <br />roadway, Tier 2 project in BMP Bicycle 27,000 <br />T2-L Pigeon Creek Road <br />bicycle facility <br />Add a bicycle boulevard to the <br />existing roadway, Tier 2 project in <br />BMP. Improve safety and <br />connectivity for pedestrians and <br />cyclists <br />Bicycle 6,275,000 <br />T2-R Grand Avenue bicycle <br />facility (Norton -43rd) <br />Add a bicycle boulevard. to the <br />existing roadway, Tier 2 project in <br />BMP <br />Bicycle 65,490 <br />T3-G 25th Street bicycle <br />facility <br />Add a bicycle lane to the existing <br />roadway, Tier 3 project in BMP Bicycle 23,000 <br />T3-N W 18th Avenue bicycle <br />facility <br />Add a shared route to the existing <br />roadway, Tier 3 project in BMP Bicycle 23,000 <br />CEF-P Summit Avenue <br />connection facility <br />Add a bicycle lane to the existing <br />roadway, Connection between <br />existing facilities in BMP <br />Bicycle 30,000
The URL can be used to link to this page
Your browser does not support the video tag.