My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 4101-25
>
Ordinances
>
Ordinance 4101-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2025 3:28:15 PM
Creation date
6/24/2025 3:16:06 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
4101-25
Date
6/18/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EVERETT 2044 <br />COMPREHENSIVE PLAN <br /> <br /> <br /> <br /> 6/17/2025 <br />COMPREHENSIVE PLAN <br />TRANSPORTATION ELEMENT <br /> Page 120 <br /> <br /> <br /> <br />ROADWAY & MULTIMODAL PROJECTS <br />PROJECT ID PROJECT NAME DESCRIPTION MODE COST 1 <br />NA <br />Downtown Access <br />Improvements <br />following the US -2 <br />study <br />The US -2 study will recommend a <br />number of projects to increase <br />connectivity and access in <br />Downtown Everett. The exact <br />locations and details are currently <br />unknown. <br />Multimodal $10,000,000 <br />FPR-04 Evergreen Corridor <br />Rebuild <br />Rebuild Evergreen Way to meet city <br />standards, update access control, <br />construct BAT lanes, and build <br />bicycle facilities (T3 -K) and <br />sidewalks. <br />Roadway $20,250,000 <br />R03 100th Street SW <br />Improvements <br />This project will include improved <br />roadway, bike lanes (BMP CEF -A1, <br />CEF -A2), sidewalks and transit stops <br />along both sides of this arterial <br />corridor between the Paine Field <br />MIC and two lines of the Swift Bus <br />Rapid Transit system to enhance <br />transit and non -m otorized access. <br />Roadway $5,760,000 <br />R04 Broadway Corridor <br />Improvements <br />Widen to 3 lanes with bike lanes, <br />sidewalks, new bridge. Transit signal <br />priority. <br />Roadway 13,250,000 <br />R05 <br />41st Street Rucker <br />Avenue Freight <br />Corridor Phase 2 <br />Arterial and access improvements <br />from Port of Everett to I -5 on West <br />Marine View Drive to Rucker Avenue <br />to 41st Street with improvements to <br />better accommodate over - <br />dimensional freight traffic and <br />increasing general freight traffic. <br />Roadway $0 <br />R13 SE Everett Mall Way <br />Corridor <br />Upgrades to improve safety and <br />reduce congestion Roadway $1,000,000 <br />R27 41st St at Colby Ave Intersection upgrades to improve <br />safety and reduce congestion Roadway $3,000,000 <br />R14 Mukilteo Blvd. Safety <br />Improvements Safety improvements Roadway $3,300,000
The URL can be used to link to this page
Your browser does not support the video tag.