My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 4101-25
>
Ordinances
>
Ordinance 4101-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2025 3:28:15 PM
Creation date
6/24/2025 3:16:06 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
4101-25
Date
6/18/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EVERETT 2044 <br />COMPREHENSIVE PLAN <br /> <br /> <br /> <br /> 6/17/2025 <br />COMPREHENSIVE PLAN <br />TRANSPORTATION ELEMENT <br /> Page 121 <br />R22 <br />37th Street <br />improvements and <br />traffic signal <br />Channelization and signal <br />improvements Roadway $500,000 <br />R28 <br />Broadway at Marine <br />View Drive Intersection <br />Improvements <br />Upgrades to improve safety and <br />reduce congestion Roadway $2,000,000 <br />R44 <br />100th Street SE <br />Improvements (7th Ave <br />to Evergreen) <br />Extend 100th Street to connect the <br />roadway from its current end at 7th <br />Avenue SE west to Evergreen Way <br />where it restarts as 100th Street <br />SW. <br />Roadway $1,000,000 <br />R20 Lenora St./BNSF Rail <br />Line Overcrossing <br />Upgrades to improve safety and <br />reduce congestion Roadway 1,800,000 <br />R23 3rd Avenue SE Street <br />Improvements Create a new roadway connection Roadway 675,000 <br />R24 <br />Upper & Lower Ridge <br />Road Street <br />Improvements <br />Upgrades to improve safety and <br />reduce congestion Roadway 300,000 <br />R30 Chestnut St. /Eclipse <br />Mill Rd. Improvements <br />Intersection upgrades to improve <br />safety and reduce congestion Roadway 3,350,000 <br />R33 NB Everett Mall Way to <br />SB I -5 Onramp <br />Upgrades to improve safety and <br />reduce congestion Roadway 3,500,000 <br />FPR-05 <br /> <br />SR 529 Smith Island <br />Safety: Grade Crossings <br />Elimination and <br />Highway Connections <br />Project <br />Reconfigure the SR 529 Smith Island <br />Interchange. The project will create <br />a new overpass over the BNSF <br />mainline, close the existing <br />crossings at 36th Place NE and 32nd <br />Ave NE, and build a new integrated <br />roundabout. <br />Roadway 3,500,000 <br />R21 <br /> <br />East Everett Ave./ <br />BNSF Overcrossing <br />Upgrades to improve safety and <br />reduce congestion Roadway 7,000,000 <br />FPR-01 <br />19th Avenue/100th <br />Street SE Concurrency <br />Project <br />This project currently fails LOS <br />standards at 19th Ave and 100th St <br />SE. Optimize the signal timing and <br />add a northbound right turn pocket <br />and westbound left turn pocket to <br />reduce delay. <br />Roadway - <br />Concurrency $4,000,000 <br />FPR-02 <br />19th Avenue/110th <br />Street SE Concurrency <br />Project <br />This project currently fails LOS <br />standards at 19th Ave and 110th St <br />SE. Optimize the signal timing and <br />add a southbound through lane to <br />reduce delay. Coordinate with <br />changes at 19th Ave/112th Street <br />SE. <br />Roadway - <br />Concurrency $4,000,000
The URL can be used to link to this page
Your browser does not support the video tag.