Laserfiche WebLink
EVERETT 2044 <br />COMPREHENSIVE PLAN <br /> <br /> <br /> <br /> 6/17/2025 <br />COMPREHENSIVE PLAN <br />TRANSPORTATION ELEMENT <br /> Page 122 <br />FPR-03 <br />19th Avenue/112th <br />Street SE Concurrency <br />Project <br />This intersection currently fails LOS <br />standards at 19th Ave and 112th St <br />SE. Optimize the signal timing and <br />add a southbound through lane to <br />reduce delay. Coordinate with <br />changes at 19th Ave/110th Street <br />SE. <br />Roadway - <br />Concurrency $4,000,000 <br />R46 <br />Airport Road at <br />Evergreen Way <br />Concurrency Project <br />This project currently fails LOS <br />standards. Optimize the signal <br />timing to reduce delay. <br />Roadway - <br />Concurrency $1,000,000 <br />Roadway & Multimodal Project Total $103,925,400 <br />1 Cost represents Everett’s estimated cost, the total cost of the project may be higher if it is shared <br />with other agencies or awarded grants. <br /> <br />PROJECTS TOTAL PROJECT <br />TOTAL <br />Bicycle Project Total $38,523,000 <br />Pedestrian Project Total $18,839,700 <br />Trail Project Total $10,430,200 <br />Roadway & Multimodal Project Total $103,925,400 <br />Total of All Projects $171,718,300 <br /> <br /> <br />EVERETT TRANSIT PROJECTS <br />PROJECT <br />ID PROJECT NAME DESCRIPTION MODE COST 1 <br />T1 Swift BRT Gold Line - <br />Smokey Point Corridor <br />Swift Bus Rapid Transit (BRT) on N <br />Broadway (Smokey Point corridor) <br />from Everett Station up N Broadway, <br />SR 529, State Ave, Smokey Pt to <br />Arlington (SR 531). Requires speed <br />& reliability improvements and <br />accessible transit stops. <br />Transit $0 <br />T3 <br />Swift BRT Silver Line - <br />Airport Road to <br />Cathcart Way (Everett) <br />Swift Bus Rapid Transit (BRT) on <br />Airport Rd, 128th, 132nd, Cathcart <br />Way from SR 526 to SR 9. Requires <br />speed & reliability improvements <br />and accessible transit stops. <br />Transit $0 <br />NA Everett Station Repair <br />and Updates Make updates to Everett Station Transit $5,000,000