My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 4101-25
>
Ordinances
>
Ordinance 4101-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2025 3:28:15 PM
Creation date
6/24/2025 3:16:06 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
4101-25
Date
6/18/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EVERETT 2044 <br />COMPREHENSIVE PLAN <br /> <br /> <br /> <br /> 6/17/2025 <br />COMPREHENSIVE PLAN <br />TRANSPORTATION ELEMENT <br /> Page 81 <br />Transportation Element <br />VISION: People and goods move easily, efficiently, and safely within and through Everett. <br />ELEMENT SCOPE: The Transportation Element addresses how people and goods get around the city by <br />all modes, including walking and rolling, cars, buses, rail and trucks. <br />The Transportation Element establishes a strategic framework to guide transportation investments in <br />Everett through the next 20 years to the horizon year 2044, based on the community's vision and goals. <br />The element incorporates both immediate and long-term strategies, encompassing programs, policies, <br />and projects to foster the growth of an integrated multimodal transportation system in Everett. The plan <br />aligns with and helps implement the Regional Transportation Plan as well as other elements of the <br />Comprehensive Plan, and guides more detailed plans like the Bicycle Master Plan, ADA Transition Plan, <br />and Everett Transit Long Range Plan. The plan guides the work of city staff and transportation agencies <br />operating in Everett and steers the development of the City’s six-year Transportation Improvement <br />Program (TIP), annual city budgets, and capital funding ordinances by outlining the projects the city will <br />pursue to accommodate travel demands during the planning period. <br />Getting Around Everett <br />Since the last plan update, the city has revamped its overall planning framework, which sets the tone for <br />the investment priorities that are established in this plan. Key changes include: <br />• Higher growth targets; A focus on facilitating middle housing to provide reasonable and <br />affordable housing options for people who live in Everett <br />• Updating Everett’s street network to ensure that people have safe travel options beyond <br />driving, including the ability to access future Swift and light rail services on foot or by <br />bicycle/scooter <br />• Further emphasizing new requirements around climate planning and the environment, including <br />supporting regional goals to dramatically reduce vehicle miles traveled and greenhouse gas <br />emissions, support fish passage, and clean stormwater runoff from our roads <br />• Enhanced focus on equity and addressing the disproportionate pollution and transportation <br />injury and health burdens that have been placed on historically marginalized communities <br />• Thinking proactively about how the City’s transportation network can be operated and <br />maintained in a good state of repair and coexist within the broader regional system of freeways <br />and transit services <br />These changes directly affect how this plan has been developed, including the transportation needs <br />identified, the investments considered, and the ultimate set of policies, projects, and programs <br />advanced. <br />The Urban Form Element of this Comprehensive Plan describes land uses in Everett today, in terms of <br />current densities and form, as well as what is planned for the future. The Our Community section
The URL can be used to link to this page
Your browser does not support the video tag.