My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 4102-25
>
Ordinances
>
Ordinance 4102-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2025 3:49:40 PM
Creation date
6/24/2025 3:42:46 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
4102-25
Date
6/18/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EVERETT 2044 <br />DEVELOPMENT REGULATIONS <br /> <br /> <br />6/17/2025 <br />DEVELOPMENT REGULATIONS <br />Page 182 <br />This sectfon applies to development actfvitfes and uses within the port compatfbility area (“PCA”), as set 1 <br />forth in Map 17-2. 2 <br />A. Uses and Development Approvals Within the Port Compatfbility Area (PCA). All propertfes located 3 <br />within the PCA Port Compatfbility Area shall be permitted to have the same uses as permitted in the 4 <br />underlying zoning district subject to the requirements of the underlying use zone and the requirements 5 <br />of this sectfon. 6 <br />1. The city shall provide a written notfce of permit applicatfons to the managers of the port for 7 <br />new developmental actfvitfes with more than development applicatfons for new constructfon or 8 <br />building expansion resultfng in of ten thousand square feet of building gross floor area within 9 <br />the PCA, and shall allow the manager(s) to submit comments to the department regarding the 10 <br />proposal, including those related to potentfal adverse impacts on port operatfons, in additfon to 11 <br />any notfce requirements for the proposed use or underlying use zone for Review Process II, III, or 12 <br />V applicatfon. A preapplicatfon meetfng under EMC Title 15 may be required unless waived by 13 <br />the city. 14 <br />2. The city shall consider comments provided by the Port of Everett, and where necessary, 15 <br />apply such conditfons of approval to mitfgate potentfal impacts to port operatfons or to identffy 16 <br />measures the applicant may employ to mitfgate potentfal or perceived impacts to their proposed 17 <br />project related to existfng or future port operatfons. 18 <br />B. Notfce and Disclosure Within Port Compatfbility Area. This subsectfon establishes notfficatfon and 19 <br />disclosure requirements for any development applicatfons development actfvitfes or uses within a port 20 <br />compatfbility area (PCA) subject to the requirements of identffied in subsectfon EMC 19.17.110(A)(1) this 21 <br />sectfon applicatfon for more than ten thousand square feet of building gross floor area within the PCA. 22 <br />1. The city shall provide written notfce to applicants that their project is within the PCA and 23 <br />written disclosure of potentfal impacts to the property related to port operatfons. The text of the 24 <br />written notfce and disclosure shall be maintained by the Planning Director with input from the 25 <br />managers of the port. 26 <br /> That notfce shall include the following language: 27 <br />Your real property is located within the Port Compatfbility Area (PCA). Occupants of 28 <br />propertfes within the PCA may be subject to inconveniences or discomforts arising from 29 <br />maritfme actfvitfes, including but not limited to noise, odors, glare, fumes, dust, 30 <br />constructfon actfvity, smoke, traffic, hours of operatfon, low overhead flights and other 31 <br />maritfme actfvitfes. Everett Municipal Code (EMC) 19.17. requires that you receive this 32 <br />disclosure notfce in connectfon with permits you are or may be seeking. Provisions of 33 <br />EMC 20.08 provide that noise exemptfons apply to “created by watercraft ... in 34 <br />operatfon”, and “operatfon of equipment or facilitfes of surface carriers engaged in 35 <br />commerce by railroad”. The City of Everett has adopted PCA regulatfons in Chapter 19.17 36 <br />EMC which may affect you and your land. 37 <br />2. Applicants for development identffied in subsectfon EMC 19.17.110(A)(1) within the PCA are 38 <br />encouraged, but not required, to work cooperatfvely with the Port of Everett in the design of 39
The URL can be used to link to this page
Your browser does not support the video tag.