Laserfiche WebLink
Acre Short Plat Stormwater Site Plan <br /> STORMWATER SITE PLAN <br /> FOR <br /> ACRE SHORT PLAT <br /> CITY OF EVERETT,WA <br /> TABLE OF CONTENTS <br /> SECTION I —PROJECT DESCRIPTION------------------------------------------------------------------------------ ------------- ---- - -----3 <br /> FIGURE 1 —VICINITY MAP <br /> SECTION 2—SITE ASSESSMENT--------........................................-....................-------------------------------------------------�� <br /> SECTION 3—SITE DEVELOPMENT PLAN W f ON-SITE STORMWATER MANAGEMENT.................„----------.-------_-..________6 <br /> SECTION 4—CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN--------------------------------------------------------7. <br /> SECTION 5—SOURCE CONTROL PLAN------------------------------------------------------------------------------------------------ ---------1 3 <br /> SECTION 6—SPECIAL REPORTS AND STUDIES------------------------ --------------------- ------------------------------------------------ 14 <br /> SECTION 7—OTHER PERMITS------------------------------------------------------ -------------- ------------_------ _------------...1 5. <br /> SECTION 8—PERMANENT STORMWATER CONTROL PLAN................................------------------------------------------------1 6 <br /> SECTION 8.A—OFF-SITE ANALYSES <br /> SECTION 8.R—PRE-DEVELOPED HYDROLOGY <br /> SECTION 8.0—DEVELOPED HYDROLOGY <br /> SECTION 8.1)—STORMWATER FLOW CONTROL PLAN <br /> SECTION 8.E—CONVEYANCE ANALYSIS <br /> SECTION 8.F—MAINTENANCE AND OPERATION PLAN <br /> FIGURES ---------------------------------------------- --------- ---------- -----------------------•----------------- ...... <br /> FIGURE 2—EXISTING SITE CONDITIONS <br /> FIGURE 3—ON-SITE DEVELOPED SITE CONDITIONS <br /> ----------------------------------- <br /> APPENDICES------------ -- --------------------------------------------- <br /> APPENDIX A--NRCS SOILS REPORT AND GEOTECHNICAL REPORT <br /> APPENDIX 8—2010 COESWMM EXCERPTS <br /> APPENDIX C—W WHM MODEL INPUT AND RESULTS <br /> APPENDIX D—SOURCE CONTROL PLAN <br /> APPENDIX E—MAINTENANCE AND OPERATION PLAN <br /> i <br /> October 15,2021 <br /> Page 2 <br />