Laserfiche WebLink
Acre Short Plat Stormwater Site Plan <br /> • Storm Drain Inlet Protection (BMP C220) <br /> Slit fences will be placed as shown on the plans or as directed by the City inspector. <br /> In addition, sediment will be removed from paved areas in construction work areas manually or using <br /> mechanical sweepers, as needed, to minimize tracking of sediments on vehicle tires away from the site <br /> and to minimize wash off of sediments from adjacent streets in runoff. <br /> Whenever possible,sediment laden water shall be discharged into on-site, relatively level, vegetated <br /> areas. In some cases, sediment discharge in concentrated runoff can be controlled using permanent <br /> stormwater BMPs (e.g., infiltration swales, ponds,trenches). Sediment loads can limit the effectiveness <br /> of some permanent stormwater BMPs, such as those used for infiltration or biofiltration; however, <br /> those BMPs designed to remove solids by settling (wet vaults or detention tanks) can be used during <br /> the construction phase. <br /> 5. Stabilize Soils <br /> Exposed and unworked soils shall be stabilized with the application of effective BMPs to prevent <br /> erosion throughout the life of the project. The specific BMPs for soil stabilization that shall be used on <br /> this project include: <br /> • BMP C121: Mulching <br /> • BMP C125: Topsailing <br /> • BMP C140: Dust Control <br /> In general, cut and fill slopes will be stabilized as soon as possible and soil stockpiles will be <br /> temporarily covered with plastic sheeting, All stockpiled soils shall be stabilized from erosion, <br /> protected with sediment trapping measures, and where possible, be located away from storm drain <br /> inlets, waterways, and drainage channels, <br /> 6. Protect Slopes <br /> All cut and fill slopes will be designed, constructed, and protected in a manner than minimizes erosion. <br /> The following specific BMPs will be used to protect slopes for this project; <br /> • BMP C120: Temporary and Permanent Seeding <br /> • BMP C207: Check Dams <br /> Minimal construction is proposed for wet weather season and slope protection can be established with <br /> final landscaping. <br /> 7. Protect Drain Inlets <br /> All storm drain inlets and culverts made operable during construction shall be protected to prevent <br /> unfiltered or untreated water from entering the drainage conveyance system. Storm Drain Inlet <br /> Protection (BMP C220) will be implemented for all drainage inlets and culverts that could potentially <br /> be impacted by sediment-laden runoff on and near the project site. The following inlet protection <br /> measures will be applied on this project: <br /> i <br /> • BMP C220: Storm Drain Inlet Protection <br /> E <br /> 8. Stabilize Channels and Outlets <br /> Where site runoff is to be conveyed in channels or discharged to a stream or some other natural <br /> drainage point, efforts will be taken to prevent downstream erosion. The specific BMPs for channel <br /> and outlet stabilization that shall be used on this project include: <br /> • BMP C209: Outlet Protection <br /> i October 15, 2021 <br /> Page 8 <br />