Laserfiche WebLink
Acre Short Plat Stormwater Site Plan <br /> SECTION 4 -- CONSTRUCTION STORMWATER POLLUTION <br /> PREVENTION PLAN <br /> Site specific details and provisions for the temporary erosion and sediment control (ESC) facilities are <br /> provided with the improvement plans that accompany this SSP. The proposed facilities have been selected <br /> and sized in accordance with the recommendations provided in the COESWMM. In addition to the site-specific <br /> ESC measures, the following general BMPs for sediment control shall also be implemented in accordance with <br /> the provisions of the COESWMM: <br /> 1. Mark Clearing Limits <br /> To protect adjacent properties and to reduce the area of soil exposed to construction,the limits of <br /> construction will be clearly marked before land-disturbing activities begin. Trees that are to be <br /> preserved, as well as all sensitive areas and their buffers, shall be clearly delineated,both in the <br /> field and on the plans. In general, natural vegetation and native topsoil shall be retained in an <br /> undisturbed state to the maximum extent possible. The BMPs relevant to marking the clearing limits <br /> that will be applied for this project include: <br /> • BMP C101: Preserving Natural Vegetation <br /> • BMP C103: High Visibility Plastic Fence <br /> Tree protection will be provided for all trees to remain, including all trees adjacent to the <br /> work and outside the construction limits as noted on the drawings. <br /> 2. Establish Construction Access <br /> Construction access shall be stabilized to minimize the tracking of sediment onto public roads; street <br /> sweeping shall be employed to prevent sediment from entering state waters. The specified BMPs <br /> related to establishing construction access that will be used on the project include: <br /> • BMP C105: Stabilized Construction Entrance <br /> • BMP C106: Wheel Wash <br /> A construction access shall be implemented to prevent tracking any sediment onto City or <br /> State roads or onto the adjacent properties. A wheel wash will be provided if required by <br /> the City inspector during construction. <br /> 3. Control Flow Rates <br /> In order to protect the properties and waterways downstream of the project site, stormwater <br /> discharges from the site will be controlled during construction. Flow rates during construction are <br /> proposed to be controlled using the proposed permanent storm water facilities, i.e. detention facility <br /> and flow control riser. In general, discharge rates of stormwater from the site will be controlled where <br /> increases in impervious area or soil compaction during construction could lead to downstream erosion, <br /> or where necessary to meet local agency stormwater discharge requirements. The following specific <br /> BMPs will be used to protect slopes for this project: <br /> • BMP C240: Sediment Trap <br /> • BMP C241: Temporary Sediment Pond <br /> 4. Install Sediment Controls <br /> All stormwater runoff from disturbed areas shall pass through an appropriate sediment removal BMP <br /> F before leaving the construction site or prior to being discharged to an infiltration facility. The specific <br /> k BMPs to be used for controlling sediment on this project include; <br /> • BMP C231 Silt Fence <br /> October 15,2021 <br /> Page 7 <br />