Laserfiche WebLink
June 24, 2024 <br />P, Floor Exterior Walls: <br />❑ FrontP2-2 Exterior Shear Wall (All units) <br />o Edge Nailing and Sheathing Splices: Note: (5) instances of insufficient nailing were observed at <br />time of inspection. Builder has been notified and has provided pictures. Builder confirms <br />construction conforms to plan set. <br />o Plate Nailing and Framing Clips as specified on plans: Construction Conforms to plan set. <br />o Panel Seam Construction. Note: All instances of the garage door straps per 4/S06 were observed <br />to be missing at time of inspection. Builder has been notified and has provided pictures of <br />the resolution. Construction conforms to plan set. <br />o Anchor bolt spacing: Construction conforms to plan set. <br />❑ Rear Pl-2 Exterior Shear Wall (All units) <br />o Edge Nailing and Sheathing Splices: Construction conforms to plan set. <br />o Plate Nailing and Framing Clips as specified on plans. Construction conforms to plan set. <br />o Panel Seam Construction. Construction conforms to plan set. <br />o Anchor bolt spacing: Note: All anchor bolts were observed to be located too far away from the <br />exterior sheathing per 1/S06. Builder has been notified and has provided pictures of the <br />resolution; Builder confirms Construction conforms to plan set. <br />Give me a call if you have any questions or comments. <br />Sincerely, <br />Aiden Bernhardt, P.E. <br />BTL Engineering <br />0 Page 2 <br />