Laserfiche WebLink
• <br /> • <br /> ' Two 16d nails into Ttrio led nails Minimum of 2 x 3-inch lumber <br /> floor joist - <br /> • <br /> /�1 • <br /> • <br /> Drain pipe ��Two led nails • <br /> info floor joist <br /> Minimum of Ns.• \' Two staples or screws <br /> lumber <br /> nch \ • <br /> �.� on eachs ide <br /> Galvanized or <br /> aluminum strap / 1 Sd nails <br /> . Galvanized of <br /> aluminum strap <br /> • <br /> Minirnum of <br /> Two 16-gauge, LI "', -- -"'" 1 x 3-inch • <br /> 7/166 x 2-inch lumber <br /> staples each end • <br /> (1-inch lumber) - - — Minimum of <br /> or two led nails 2 x 3-inch <br /> lumber <br /> Drain pipe Two staples each side <br /> Galvanized or <br /> aluminum strap <br /> • <br /> • <br /> Figure 8-.3--Drain-pipe support methods <br /> • <br /> Second <br /> Stool drop <br /> Main stool drop <br /> ci Strap support <br /> 4 feet on center <br /> • Shipping cap ! J ' <br /> Shipping <br /> cap • <br /> • <br /> Field-installed,slope 1/4 inch per foot <br /> To sewer <br /> • <br /> • <br /> Figure 2• •-_ D•ain-pipe slope and connections <br />