My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11622 SILVER LAKE RD 2023 Plans 2025-07-18
>
Address Records
>
SILVER LAKE RD
>
11622
>
Plans
>
11622 SILVER LAKE RD 2023 Plans 2025-07-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2025 3:37:09 PM
Creation date
7/1/2025 11:57:36 AM
Metadata
Fields
Template:
Address Document
Street Name
SILVER LAKE RD
Street Number
11622
Permit
B2305-012
Year
2023
Notes
REPLACE EXISTING MANUFACTURED HOME W/ NEW MANUFACTURED HOME
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> • <br /> • <br /> (a) This system is utilized when a cross-over duct has not been built into the floor, and the <br /> furnace is outside the I-beam.With this type of installation,it is necessary for two <br /> • flexible ducts to be installed. <br /> • <br /> Furnace "Vee' <br /> / - l> <br /> E_ • <br /> • �— �; Strap <br /> 10-Inch diameter flexible <br /> support Duct <br /> insulated duct with 1.0 perm. Block <br /> maximum vapor barrier --� support <br /> Flexible duct shall not-be in • • • <br /> contact with the ground <br /> • <br /> • <br /> • <br /> (b)- This system is used when a cross-over duct has not been built into the floor, and the <br /> furnace is situated directly over the main duct in one section of the home. A single <br /> flexible duet is then used to connect the two sections to each other, <br /> • <br /> r-11- Furnace • <br /> f <br /> • <br /> Strap <br /> support <br /> \ Duct <br /> 10-inch diameter flexible �� Block <br /> insulated duct with 1.0 perm { upporf <br /> maximum vapor barrier • I <br /> Flexible duct shall not be in - <br /> contact with the ground • <br /> • <br /> Figure 5-1 --Cross-over duct Installation <br />
The URL can be used to link to this page
Your browser does not support the video tag.