My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Washington State Department of Ecology 7/2/2025 Amendment 1
>
Contracts
>
Agreement
>
Grant Agreement (City as Grantee)
>
Washington State Department of Ecology 7/2/2025 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 9:25:32 AM
Creation date
7/3/2025 9:25:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Washington State Department of Ecology
Approval Date
7/2/2025
Council Approval Date
6/25/2025
End Date
6/30/2026
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
100th St Regional Stormwater Facility Study - WQC-2022-EverPW-00084
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003493
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Grant Agreement (City as Grantee)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 7 of 11State of Washington Department of Ecology <br />City of Everett <br />100th St. SW Regional Stormwater Facility Study Project <br />Agreement No. WQC-2022-EverPW-00084 <br />The RECIPIENT agrees to respond to ECOLOGY comments. The RECIPIENT must receive an Ecology 90 Percent Design <br />Acceptance Letter prior to proceeding Final Design. <br />B.The RECIPIENT will calculate and submit a preliminary equivalent new/re-development area for the completed retrofit <br />project(s) using the methods outlined in the Design Deliverables Document. <br />C. The RECIPIENT will submit a preliminary GIS compatible project area in shapefile , geodatabase file, or <br />ECOLOGY-approved equivalent. The project area should include polygon features for stormwater facilities and contributing <br />areas. <br />Task Goal Statement: <br />The RECIPIENT will complete all design tasks and respond to ECOLOGY comments in a timely manner . <br />Task Expected Outcome: <br />The project will meet the requirements set forth by ECOLOGY water quality facility design standards and all other applicable <br />federal, state, and local laws, and regulations. <br />Deliverables <br />Due DateDescriptionNumber <br />5.1 Contract documents (if contracting out for design). Upload to EAGL and <br />notify ECOLOGY when upload is complete . <br />5.2 Design Report. Upload to EAGL and notify ECOLOGY when upload is <br />complete. <br />5.3 Responses to ECOLOGY Design Report comments . Upload to EAGL <br />and notify ECOLOGY when upload is complete. <br />5.4 ECOLOGY Design Report Acceptance Letter . Upload to EAGL and <br />notify ECOLOGY when upload is complete . <br />5.5 90 Percent Design Package. Upload to EAGL and notify ECOLOGY <br />when complete. <br />5.6 Responses to ECOLOGY 90 Percent Design Package comments. <br />Upload to EAGL and notify ECOLOGY when upload is complete . <br />5.7 ECOLOGY 90 Percent Design Acceptance Letter . Upload to EAGL <br />and notify ECOLOGY when upload is complete. <br />5.8 Preliminary equivalent new/redevelopment area determination. Upload to <br />EAGL and notify ECOLOGY when upload is complete . <br />Template Version 10/30/2015 <br />Docusign Envelope ID: 7C66725B-AA08-42E8-B48A-416E600A0A3C
The URL can be used to link to this page
Your browser does not support the video tag.