Laserfiche WebLink
Date :21-Apr-25 <br />To:Bayley Construction <br />8005 SE 28th St <br />Mercer Island, WA 98040 <br />Attn:Hans E. Hansen Quote ID #EST10198 <br />Subject:Everett Multipurpose Stadium - Design Cost Breakdown Phase 1 & Phase 2 <br />Dear:Hans E. Hansen <br />Thank you for the opportunity to prepare this HVAC & Plumbing Design Cost proposal . JMI proposes to provide <br />your firm with preconstruction services as described below: <br />Inclusions: <br />Services will be broken down into the two phases below: <br />1)       Phase 1: Design and Pre-Construction Services <br />a)       Schematic Design (SD) <br />b)       Design Development (GMP) to be provided by JMI for HVAC & Plumbing <br />2)       Phase 2: Construction Design <br />a)       Construction Documents (CD) <br />b)       Construction Documents (GMP) to be provided by JMI for HVAC & Plumbing <br />c)       Construction Administration <br />d)       Project Closeout of Design Documents <br />Scope of Work for Pre-construction Services: <br />1)       Phase 1 Scope of Work <br />a)       Schematic Design (SD) of HVAC and Plumbing Systems, <br />i)        Attend weekly coordination meetings with the stakeholders <br />ii)       Attend weekly meetings with the internal Design-Build team <br />iii)      Generate Schematic Design Report to describe proposed HVAC and Plumbing Systems. <br />iv)      Generate Preliminary drawings to show preliminary plans and show what systems are proposed for each area. <br />v)       Help determine size of mechanical rooms and equipment locations. <br />b)       Scope of Work for Design Development (DD) of HVAC and Plumbing Systems. <br />i)        Attend weekly coordination meetings with stakeholders. <br />ii)       Attend weekly meetings with the internal Design-Build team <br />iii)      Generate DD level drawings including: <br />1)       HVAC Equipment schedules <br />2)       HVAC Equipment locations <br />3)       Duct and piping mains <br />4)       Plumbing equipment schedules <br />5)       Plumbing piping mains <br />6)       Plumbing equipment locations <br />i)        Specifications for plumbing and HVAC items. <br />ii)       Coordinate all systems with all other disciplines to provide a coordinated set of drawings. <br />iii)      Provide enough information for JMI and Hawk to provide a GMP to Bayley. <br />Phase 2 Scope of Work: <br />a)       Construction Documents (CD) <br />i)        Finalize design drawings to be ready to submit for permit. Drawings to be developed to LOD 300. <br />ii)       Finish coordination between all disciplines. <br />iii)      Update design with any VE items that may come up after GMP. <br />iv)      Finish control diagrams and SOOs for all HVAC systems. <br />v)       Finish domestic cold water and hot water diagrams. <br />vi)      Finish waste and vent diagrams. <br />vii)    Add details, sections and enlarged plans as needed. <br />viii)   Finalize equipment schedules. <br />1 of 3 <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal