b)       Construction Services <br />i)        Answer RFIs <br />ii)       Review submittals <br />iii)      Perform five site visits during construction. <br />Budget: <br />Overall $42 million construction budget as established by Owner on March 28, 2025. <br />Schedule: <br />Phase 1: <br />Schematic Design will kick off on approximately May 15, 2025, and will be completed approximately June 30th, 2025. <br />Design Development will be run from July 1, 2025, through August 15, 2025. GMP due September 8, 2025 . <br />Phase 2: <br />Construction Documents will be completed Approximately November 14, 2025. Updated GMP due November 28, 2025 . <br />Construction is predicted to be completed April 2027. <br />Clarifications: <br /> We are requesting clarification on the Food Service Equipment scope for the project. Defining the scope of Kitchen Exhaust <br /> Hoods, Dishwashers, Grease Waste Systems, Gas requirements, Sinks, Beer & Soda Lines, Glasswashers, Boosted Hot Water, <br /> etc. will be critical to help us in the design efforts. <br />Exclusions: <br /> Engineering - Civil, Electrical, Structural, Architectural, Fire Protection <br /> Demolition - Mechanical and Systems of, Building and or Property. <br /> Earthworks - Materials, Excavation, Trenching, Backfill and Cover Compaction, Materials Testing and Reporting of any kind. <br /> Electrical - Conduit, Panels/Breakers, Power Wiring, Motor Starters or Disconnects, Wireless or Remote <br /> Painting - Any & ALL, Including Mechanical surfaces, Building or Property <br /> Equipment Pads / House keeping pads, Mechanical Structures <br /> Generator Exhaust, Mufflers and Accessories <br /> Temporary Heating, Cooling, Controls, Air, Power / Electrical, Water, Gas, Propane. <br /> Fire Protection and or Suppression <br /> Fire Alarm Systems <br /> Security Systems <br /> Asbestos and All other Hazardous Materials Testing or Abatement of <br /> Mold & Mildew - Moisture Protection <br /> Overtime or Shift Work Hours ( before 6am & after 5pm M-F, Saturday, Sunday & Holidays ) <br /> Conveying Systems - Elevators, Escalators, Conveyors, Dumbwaiters <br /> Bonds and Related Fees <br /> Permits and Related Fees <br /> Washington State Sales Tax <br /> All construction costs associated with HVAC systems, ductwork, equipment, management & labor <br /> All construction costs associated with Plumbing systems, equipment, management & labor <br /> Food Service Equipment <br />Base Pricing - Phase 1 Design Cost………………………….…………………………………………………248,409$ <br />Phase 1 Design Cost Breakdown <br />1)       Phase 1 Scope of Work <br />a)       Schematic Design (SD) of HVAC and Plumbing Systems (SD TOTAL - $60,500 ) <br />i)        Attend weekly coordination meetings with the stakeholders ($1,650) <br />ii)       Attend weekly meetings with the internal Design-Build team ($1,650) <br />iii)      Generate Schematic Design Report to describe proposed HVAC and Plumbing Systems. ($22,000) <br />iv)      Generate Preliminary drawings to show preliminary plans and show what systems are proposed for each area. ($27,500) <br />v)       Help determine size of mechanical rooms and equipment locations. ($7,700) <br />b)       Scope of Work for Design Development (DD) of HVAC and Plumbing Systems. <br />i)        Attend weekly coordination meetings with stakeholders. ($2,750) <br />ii)       Attend weekly meetings with the internal Design-Build team ($2,750) <br />iii)      Generate DD level drawings including: <br />1)       HVAC Calculations ($11,000) <br />2)       HVAC Equipment selections and schedules ($16,500) <br />3)       HVAC Equipment locations ($11,000) <br />4)       Duct and piping mains ($27,500) <br />5)       Plumbing equipment schedules ($11,000) <br />6)       Plumbing piping mains ($16,500) <br />2 of 3 <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal