My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
April 1st, 2025 Bayley Construction 8005 SE 28th Street Mercer Island, WA 98040 Attn: Hans Hansen Subject: AquaSox Stadium Electrical Engineering Proposal Hans, We are pleased to present our proposal for design, preconstruction and engineering. We are recommending Coffman engineering, specifically Ben Maxwell as the engineering lead for this project. Cochran is a national leader in BIM/VDC, we will take on the responsibility of BIM detailing in 3D-Revit throughout the design and we will mesh our expertise with Coffman’s engineering to create one seamless design and constructable set of documents. Cochran understands that these scopes will be designed by others and is not included in our scope of work. Civil electrical work and building lighting, field lighting will be in Cochran’s scope. In addition, all low voltage systems will be designed by WJHW. We look forward to working with you on the development of the AquaSox Stadium. Sincerely, Jerod Gummer Director of Large Construction Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.