My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
AquaSox Stadium Electrical Design and Preconstruction 2 100% DD to GMP 4/1/2025 thru 9/8/2025 22.9 WeeksRate Hrs./Week Weeks Total Hrs. TotalMeetings 140$ 2.00 22.9 45.71 6,400$ Assist in Design / Coordination 140$ 2.00 22.9 45.71 6,400$ Assist in Design / Coordination 135$ 1.00 22.9 22.86 3,086$ Prefabrication Coordination 135$ 2.00 22.9 45.71 6,171$ Drawing & Constructability Review 135$ 40.00 1.0 40.00 5,400$ Administrative Work 55$ 2.00 22.9 45.71 2,514$ BIM Coordination (None prior to DD) -$ 8.00 22.9 182.86 -$ Chief Estimator 105$ 20 2,100$ Senior Estimator 75$ 20 1,500$ Estimator 60$ 60 3,600$ Chief Estimator 105$ 20 2,100$ Senior Estimator 75$ 20 1,500$ Estimator 60$ 80 4,800$ 99,000$ Misc.-$ Parking200$ 200$ 144,771$ Fee10.0%14,477$ B&O0.584%930$ 160,179$ 100% DD to 100% CD's 9/9/2025 thru 1/31/2026 20.6 WeeksRate Hrs./Week Weeks Total Hrs. TotalMeetings 140$ 4.00 20.6 82.29 11,520$ Assist in Design / Coordination 140$ 4.00 20.6 82.29 11,520$ Assist in Design / Coordination 135$ 1.00 20.6 20.57 2,777$ Prefabrication Coordination 135$ 2.00 20.6 41.14 5,554$ Drawing & Constructability Review 135$ 40.00 1.0 40.00 5,400$ Administrative Work 55$ 2.00 20.6 41.14 2,263$ BIM Coordination (100% DD to 100% CD) 135$ 20.00 20.6 411.43 55,543$ Chief Estimator 105$ 20 2,100$ Senior Estimator 75$ 40 3,000$ Estimator 60$ 40 2,400$ Chief Estimator 105$ 30 3,150$ Senior Estimator 75$ 30 2,250$ Estimator 60$ 60 3,600$ 99,000$ 210,077$ Fee10.0%21,008$ B&O0.584%1,350$ 232,434$ 392,613$ GRAND TOTALTotal ReimbursableSub-Total SD through DDSub-TotalTotalCoffman Engineering DD Through CD & Construction AdministrationBIM Team50% CD Estimate100% CD EstimateSD Through DD Sub-TotalConstruction Documents, VDC Coordination/Clash Detection & Construction AdministrationPreconstructionProject Executive/Director of PreconstructionProject Assistant50% DD EstimateSub-TotalCoffman Engineering SD Through DDSub-TotalProject General ForemanBIM Team100% DD EstimateProject Executive/Director of PreconstructionProject General ForemanProject AssistantDesign-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.