My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:56 PM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 5/1/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
AquaSox Stadium Electrical Design and Preconstruction 2 100% DD to GMP 4/1/2025 thru 9/8/2025 22.9 WeeksRate Hrs./Week Weeks Total Hrs. TotalMeetings 140$ 2.00 22.9 45.71 6,400$ Assist in Design / Coordination 140$ 2.00 22.9 45.71 6,400$ Assist in Design / Coordination 135$ 1.00 22.9 22.86 3,086$ Prefabrication Coordination 135$ 2.00 22.9 45.71 6,171$ Drawing & Constructability Review 135$ 40.00 1.0 40.00 5,400$ Administrative Work 55$ 2.00 22.9 45.71 2,514$ BIM Coordination (None prior to DD) -$ 8.00 22.9 182.86 -$ Chief Estimator 105$ 20 2,100$ Senior Estimator 75$ 20 1,500$ Estimator 60$ 60 3,600$ Chief Estimator 105$ 20 2,100$ Senior Estimator 75$ 20 1,500$ Estimator 60$ 80 4,800$ 99,000$ Misc.-$ Parking200$ 200$ 144,771$ Fee10.0%14,477$ B&O0.584%930$ 160,179$ 100% DD to 100% CD's 9/9/2025 thru 1/31/2026 20.6 WeeksRate Hrs./Week Weeks Total Hrs. TotalMeetings 140$ 4.00 20.6 82.29 11,520$ Assist in Design / Coordination 140$ 4.00 20.6 82.29 11,520$ Assist in Design / Coordination 135$ 1.00 20.6 20.57 2,777$ Prefabrication Coordination 135$ 2.00 20.6 41.14 5,554$ Drawing & Constructability Review 135$ 40.00 1.0 40.00 5,400$ Administrative Work 55$ 2.00 20.6 41.14 2,263$ BIM Coordination (100% DD to 100% CD) 135$ 20.00 20.6 411.43 55,543$ Chief Estimator 105$ 20 2,100$ Senior Estimator 75$ 40 3,000$ Estimator 60$ 40 2,400$ Chief Estimator 105$ 30 3,150$ Senior Estimator 75$ 30 2,250$ Estimator 60$ 60 3,600$ 99,000$ 210,077$ Fee10.0%21,008$ B&O0.584%1,350$ 232,434$ 392,613$ GRAND TOTALTotal ReimbursableSub-Total SD through DDSub-TotalTotalCoffman Engineering DD Through CD & Construction AdministrationBIM Team50% CD Estimate100% CD EstimateSD Through DD Sub-TotalConstruction Documents, VDC Coordination/Clash Detection & Construction AdministrationPreconstructionProject Executive/Director of PreconstructionProject Assistant50% DD EstimateSub-TotalCoffman Engineering SD Through DDSub-TotalProject General ForemanBIM Team100% DD EstimateProject Executive/Director of PreconstructionProject General ForemanProject AssistantDesign-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.