My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Mr. Seth Cirrotti-Caruso <br />Cochran Electric <br />April 1, 2025 <br />Page 5 <br /> <br /> <br />NOTICE TO PROCEED <br />Upon your concurrence with this proposal, please sign and return a copy of this proposal and <br />initial and return the attached Coffman’s General Terms and Conditions to this office for our <br />records and as our Notice to Proceed. <br /> <br />Thank you again for including Coffman Engineers, Inc. on this project. Please call me directly at <br />206-521-0728 if you have any questions. <br /> <br />Sincerely, <br /> <br />COFFMAN ENGINEERS, INC. <br /> Benjamin R. Maxwell, P.E. <br />Principal, Electrical Engineering <br /> <br />brm:rzd <br />Enclosures <br /> <br />O:\Seattle Proposals\2025\252360 AquaSox Stadium\252360 AquaSox Stadium - Electrical Proposal.docx <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />APPROVED AND ACCEPTED BY: <br /> <br />COCHRAN ELECTRIC <br /> <br /> <br /> <br />Signature <br /> <br /> <br /> <br />Title <br /> <br /> <br /> <br />Date <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.