My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:56 PM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 5/1/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Mr. Seth Cirrotti-Caruso <br />Cochran Electric <br />April 1, 2025 <br />Page 4 <br /> <br /> <br />not be incorporated and information will be minor, and Coffman will be notified of the change <br />when it occurs. <br />16. Coffman will receive mechanical, food service, plumbing, and low-voltage system <br />coordination drawings three weeks prior to the 100%CD set, and two weeks prior to the IFC <br />set. These drawings will show all required equipment that needs an electrical connection. <br />Each piece of equipment will have a voltage and load (Amps, kW, or kVA) indicated. <br />17. Significant schedule changes, major electrical system standard revisions and/or changes <br />which may require completed work to be revised shall be considered as changes in the <br />Scope of Work. <br />18. Refer to Attachment A for the level of design anticipated to be included in the 100% Design <br />Development/GMP milestone. <br />19. Security, Fire Alarm and AV system design will be by others. Coffman will coordinate <br />infrastructure support to the extent necessary. <br />20. Changes to other disciplines drawings and Owner changes that impact the electrical design <br />drawings after the IFC set will be additional services. <br />21. All construction cost estimates, construction scheduling and planning/provisions for <br />temporary electrical building support systems during construction are excluded from this <br />proposal. <br />22. All involvement with Commissioning is excluded. <br />23. Work with the utility to obtain potential energy rebates and/or subsidies for energy <br />conservation will be provided by others. <br />24. Design of temporary power for construction is excluded from this proposal. <br />FEE <br />Our compensation for providing the Scope of Work and Construction Administration Services for <br />the electrical design of this project will be a lump sum of One Hundred Ninety-Eight Thousand <br />Dollars ($198,000). This fee will be billed monthly based on a percentage of the project <br />completed. The following is a breakdown of our fee: <br />Design Development: $99,000 <br />Construction Documents: $59,400 <br />Construction Administration: $39,600 <br />Total $198,000 <br />REIMBURSABLE EXPENSES <br />Reimbursable expenses as defined in Coffman’s General Terms and Conditions will be billed at <br />actual cost-plus ten percent. The anticipated amount for reimbursable expenses is $200 which <br />is in addition to our fee for the Scope of Services noted above. <br />LABOR RATE SCHEDULE: See attached. <br /> <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.