My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br />Attachment A - Anticipated Completed Design Tasks/Items for 100% DD: <br />1. Provide the design drawings as follows: <br />- Site plan showing the following: <br />o Exterior receptacle layout. <br />o Exterior luminaire locations and luminaire types. <br />o Exterior equipment connections for site power. <br />o SnoPUD utility transformer and connection from the transformer to the main <br />service switchboard. <br />o General routing of the primary feeder to the transformer. Detailed work <br />associated with the duct bank design, vault design, and other utility owned <br />infrastructure is assumed to be shown on the Civil Drawings. <br />- Lighting plans showing the following: <br />o Luminaire layout and luminaire tags for all areas. <br />o Lighting control devices laid out for all areas and designed per the Washington <br />State Code. <br />o Switching zones and daylight zones. <br />o Locations of exit signs. <br />o Luminaire Schedule indicating fixture manufacturer and model series and <br />wattages the lighting design was based around. <br />- Power plans showing the following: <br />o Receptacle layouts for all areas. <br />o Connections for all known equipment requiring power such as elevators, fire <br />alarm panels, refrigerators, copiers, coffee makers, trach compactors, dock <br />levelers, motorized doors, etc…. <br />o Notation of generator backed devices. <br />o Electrical circuiting maps showing which areas of the facility and site are fed from <br />which panelboards. <br />o Electrical distribution equipment on the one-line and not shown in an enlarged <br />plan located on the floor plans. <br />o Location of generator fuel fill station. <br />o Location of temporary generator connection cabinet. <br />o Electrical rooms coordinated with the architect and adequately sized for the <br />equipment. <br />o Electrical vehicles rough-in and day one charging locations. <br />- HVAC & Plumbing power plans showing the following: <br />o Equipment connections and disconnects for each piece of mechanical and <br />plumbing equipment. <br />o Electrical voltages and equipment rating for each piece of mechanical and <br />plumbing equipment. <br />o Notation of which equipment is generator backed and which branch of the <br />generation system it is on. <br />- Food Service/Concessions Plans showing the following: <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal