My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:56 PM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 5/1/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />o Locations and types of devices/connections needed to power food service <br />equipment. <br />o A kitchen equipment schedule showing the power requirements for each piece of <br />food service equipment. <br />- Enlarged plans for all electrical rooms showing the following: <br />o Electrical equipment layouts with working clearance noted. <br />o Utility vault layouts with SCL required clearances noted. <br />- One-line diagram for the entire electrical distribution system including the following: <br />o Panelboard, meter center, transformers, and switchboards with ampacities and <br />equipment ratings. <br />o Feeder schedule and all feeders tagged. <br />o Generator and ATS’s with sizes shown. <br />o Generator fuel calc. <br />o Fire pumps and pump sizes shown. <br />o Feeders that require 2-hour protection noted. <br />o Energy meters needed meet the Washington State energy Code <br />o Preliminary fault currents shown. <br />o Equipment names following a naming convention designated by the engineer. <br />- Grounding riser diagram included. <br />- Preliminary load calculations for the facility. <br />- Panel Schedules with panel ratings and AIC values, branch breakers will not be defined, <br />and loads will not be included. <br />2. Excluded from CD”s but not limited to are the following items: <br />- Branch circuit wiring for all equipment, receptacles and luminaires. <br />- Construction wiring diagrams and details, if required. <br />- Non-Residential Energy Code Compliance Forms. <br /> <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.