My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />o Locations and types of devices/connections needed to power food service <br />equipment. <br />o A kitchen equipment schedule showing the power requirements for each piece of <br />food service equipment. <br />- Enlarged plans for all electrical rooms showing the following: <br />o Electrical equipment layouts with working clearance noted. <br />o Utility vault layouts with SCL required clearances noted. <br />- One-line diagram for the entire electrical distribution system including the following: <br />o Panelboard, meter center, transformers, and switchboards with ampacities and <br />equipment ratings. <br />o Feeder schedule and all feeders tagged. <br />o Generator and ATS’s with sizes shown. <br />o Generator fuel calc. <br />o Fire pumps and pump sizes shown. <br />o Feeders that require 2-hour protection noted. <br />o Energy meters needed meet the Washington State energy Code <br />o Preliminary fault currents shown. <br />o Equipment names following a naming convention designated by the engineer. <br />- Grounding riser diagram included. <br />- Preliminary load calculations for the facility. <br />- Panel Schedules with panel ratings and AIC values, branch breakers will not be defined, <br />and loads will not be included. <br />2. Excluded from CD”s but not limited to are the following items: <br />- Branch circuit wiring for all equipment, receptacles and luminaires. <br />- Construction wiring diagrams and details, if required. <br />- Non-Residential Energy Code Compliance Forms. <br /> <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.