My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />www.RedHawkFireProtection.com Page 2 of 3 <br />Scope of Work <br />1. Red Hawk Fire Protection will provide design, fabrication, materials, and installation for an automatic <br />fire protection system per the plans and specifications. <br />2. The price is based on an approximate square footage of 72,000. <br />3. The system shall be bidder designed. <br />4. The fire protection system is designed to meet the following design criteria as established by the local <br />fire department and NFPA Chapter #13. <br />5. Red Hawk Fire Protection, LLC start point is with flange located 6” above grade inside the building. <br />6. All necessary testing, permits, inspections, and related fees. <br />7. (1) Two-way rough brass fire department connection mounted on outside wall within ten feet of riser <br />location. <br />8. (1) Wet System: Riser consisting of water flow switch, control valve, tamper switch, drain valve and <br />signage. <br />9. Dry System <br />a. (1) Riser consisting of a dry pipe valve, control valve, tamper switch, pressure switch, drain <br />valve and signage. <br />b. (1) Air compressor with tank. <br />10. (1) Backflow assembly located inside building in riser room. <br />11. Coring / Sleeves. <br />12. Fire Stopping <br />13. Class I standpipe(s) equipped with 2.5” angle hose valve, cap and chain. Located in every required <br />stairwell. <br />14. Fire Pump <br />a. (1) Electric Fire Pump, Three-phase, 460-volt. <br />b. (1) Controller for main fire pump <br />c. (1) Transfer switch <br />d. (1) Jockey Pump, Three-phase, 3-phase, 460 volt and controller. <br />e. Test header <br />f. Flow meter <br />15. Underground: <br />a. Fire Foot out underground price consists of a straight run of pipe starting five feet from the <br />building line to a flange located inside the building. Offsets necessary by RHFP to meet <br />underground supply will be an additional cost. <br />b. Location of water supply flange to be located within 5' of the exterior wall. <br /> <br />Design <br />Price is based on an acceptable water flow. <br />Price is based on the water flow of ## PSI Static Pressure ### PSI Residual Pressure flowing ### GPM. <br />Pipe sized for and sprinklers spaced to the following: <br />Location Hazard Density <br />Public Space Light .10 over the most remote area. <br />Retail Ordinary II .20 over the most remote area. <br /> <br /> <br />Sprinkler Heads <br />Location Size Response Finish Type <br />Finished Ceilings ½” Quick Chrome Semi Recessed <br />Exposed ½” Quick Bronze Upright <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.