My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />www.RedHawkFireProtection.com Page 3 of 3 <br />Conditions <br />1. All work is to be performed during normal working hours (6:00 a.m. - 6:00 p.m.) unless other <br />arrangements are made. <br />2. Work area to be always accessible. <br />3. Water to be installed to riser room prior to any testing of the fire sprinkler system. <br />4. The pendent sprinklers shall be centered in ceiling tile modules in the 2-0 direction. <br />5. Sprinklers are to be installed to provide adequate coverage per code. Single sprinklers will not <br />necessarily be centered, or symmetrical with respect to lights, diffusers, smoke detectors, etc. <br />Sprinklers will be symmetrically aligned in corridors. <br />6. Drain piping to be run to an open-air discharge point within ten feet of the drain valve or device served. <br />7. This proposal is based upon installation being made from finished unobstructed concrete floors by using <br />A-ladder, forklift, or scissor lift at Red Hawk Fire Protection, LLC’s option. <br />8. This proposal is based on Red Hawk Fire Protection, LLC receiving AUTOCAD backgrounds from all <br />trades in a timely manner, without cost. <br />9. It is the owner’s responsibility to maintain adequate heat in all areas protected by the wet pipe sprinkler <br />system. <br />10. The construction standpipes are permanent standpipes. The stairs must be constructed and <br />keep pace with the building erection for the installation of the standpipe system will be aligned <br />with the construction standpipe requirements. <br />11. Material pricing is based on the current market with 5% escalation. Should material pricing, <br />specifically steel pipe, exceed this factor, RHFP will be compensated for the increases. <br /> <br />Exclusions <br />1. Fire sprinklers above finished ceiling area. If a heat detection system is required additional sprinklers <br />above these areas may be used for this requirement and they would be installed as an extra to our <br />original contract price. <br />2. Fire sprinkler head layout does not include ceiling fans or potential future ceiling fans. <br />3. FPE - Fire Protection Engineer stamp or review. <br />4. Seismic structural and civil review by professional engineer and modifications to the building structure. <br />5. All painting desired or required, including cleaning of piping, and protection of the installed sprinkler <br />heads from paint. <br />6. All electrical wiring of any kind. Including work necessary to place specified electronic alarms in service <br />including supervisory alarm system, central station monitoring and fire life safety systems and 120 VAC <br />power to the control panels or air compressor. <br />7. Pre-action systems. <br />8. Clean Agent systems. <br />9. Hood suppression systems. <br />10. Pipe identifications except that required by NFPA code. Pipe markings for exposed standpipes in <br />egress pathways. <br />11. Underground piping beyond 5 feet on the building. <br />12. Underground excavation and backfill. <br />13. Sleeves or caulking of sleeves. <br />14. Cost of bond <br />15. Water Storage tank <br />16. Fire Pump transfer switch in not required or included. <br />17. Beam penetrations. <br />18. Permanent or temporary fire extinguishers and cabinets. <br />19. Heat tape and insulation of fire mains. <br /> <br /> <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.