My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
12 <br />Progressive Design Build Contract <br /> <br /> <br />7.7.3 Savings. If the sum of the actual Design-Build Fee (as defined in 7.5 hereof), the <br />Construction General Conditions Price (Section 7.4), Pass-Through Costs (Section 7.6.3) plus the <br />Cost of the Phase 2 Work (Section 7.6.1) as provided in Article 7 hereof is less than the GMP, as <br />such GMP may have been adjusted over the course of the Project, the difference (“Savings”) may <br />be incorporated back into the Project as agreed, or returned to Owner. The Design Builder will keep <br />Owner informed of the status of all costs and opportunities to increase the outcomes of the project. <br /> <br />7.8 Allowance Items and Allowance Values. <br /> <br />7.8.1 Any and all Allowance Items, as well as their corresponding Allowance Values, shall be set <br />forth in the GMP Amendment. <br /> <br />7.8.2 Design-Builder and Owner will work together to review the Allowance Items and Allowance <br />Values based on design information then-available to determine that the Allowance Values <br />constitute reasonable estimates for the Allowance Items. Design-Builder and Owner will continue <br />working closely together during the preparation of the design to develop Construction Documents <br />consistent with the Allowance Values. Nothing herein is intended in any way to constitute a <br />guarantee by Design-Builder that the Allowance Item in question can be performed for the <br />Allowance Value. <br /> <br />7.8.3 No Work shall be performed on any Allowance Item without Design-Builder first obtaining <br />in writing advanced authorization to proceed from Owner. Owner agrees that if Design-Builder is <br />not provided written authorization to proceed by the date set forth in the Project Schedule approved <br />with the GMP Amendment, due to no fault of Design-Builder, Design-Builder may be entitled to an <br />adjustment of the Contract Time(s) and Contract Price. <br /> <br />7.8.4 The Allowance Value includes the direct cost of labor, materials, equipment, transportation, <br />taxes, and insurance associated with the applicable Allowance Item. <br /> <br />7.8.5 Whenever the actual cost for an Allowance Item is more than or less than the stated <br />Allowance Value, the Design-Builder shall report such difference to Owner so that Owner can <br />maintain a running tally of Allowance Item costs against Allowance Values. Prior to final payment, <br />the Contract Price shall be adjusted accordingly by Change Order, subject to Section 7.8.4. The <br />amount of the Change Order shall reflect the difference between actual costs incurred by Design- <br />Builder for all Allowance Items and the total Allowance Value. <br /> <br />Article 8 <br />Procedure for Payment <br />8.1 Phase 1 Payments. Phase 1 Work shall be paid by Owner based on the not-to-exceed Phase 1 <br />Price at the all-inclusive billing rates and labor categories set forth herein and as may be established in a <br />Phase 1 Amendment. All-inclusive billing rates and labor categories shall not be subject to any overtime <br />pay obligations incurred by Design-Builder nor any rate increases during Phase 1. <br /> <br />8.1.1 Phase 1 Work may be invoiced to Owner on a monthly basis on the day agreed to during <br />Partnering activities. Application for payment will be based on cost incurred during the previous <br />billing cycle. Draft applications for payment will be reviewed and agreed during weekly project <br />meetings to ensure that costs and expenses are paid as incurred and not held until a later billing <br />period. <br /> <br />8.2 Phase 2 Payments. <br /> <br />8.2.1 Progress payments will be made monthly for work duly certified, approved, and performed <br />during the calendar month preceding the Application in accordance with the following procedure,