My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
13 <br />Progressive Design Build Contract <br /> <br />which shall be in accordance with the current City of Everett Construction Management Payment <br />Schedule: <br /> <br />8.2.1.1 Draft Application. Design-Builder shall submit to Owner an accounting of the <br />current progress of the Work as compared to Design-Builder's Master Project Schedule, <br />and a draft, itemized application for payment for work performed during the current <br />payment period on a form supplied or approved by Owner. This shall not constitute a <br />payment request. Design-Builder and Owner shall discuss regarding the current progress <br />of the Work and the amount of payment to which Design-Builder is entitled. Owner may <br />on occasion request Design-Builder to provide data substantiating Design-Builder's right to <br />payment, such as, but not limited to copies of invoices from Subcontractors of any tier, and <br />reflecting retainage as provided elsewhere in the Contract Documents. <br /> <br />8.2.1.2 Payment Request. After Design-Builder and Owner have met and agreed <br />regarding the updated draft application, and Design-Builder has furnished all progress <br />information required and all data requested by Owner under 8.2.1.1 above, Design-Builder <br />shall submit Design-Builder’s Application for Payment for Work completed during the <br />previous month in accordance with Article 6 of the General Conditions on a form supplied <br />or approved by Owner. Among other things, the Application shall attest those prevailing <br />wages have been paid in accordance with the pre-filed statements of intent to pay <br />prevailing wages on file with Owner and that all payments due Subcontractors of any tier <br />from Owner's payment the prior month have been made. <br /> <br />8.2.1.3 Disputed Amounts. If Design-Builder believes it is entitled to payment for <br />Work performed during the prior billing cycle in addition to the agreed-upon amount, <br />Design-Builder may, submit to Owner along with the approved payment request a separate <br />written payment request specifying the exact additional amount due, the category in the <br />Schedule of Values in which the payment is due, the specific Work for which the additional <br />amount is due, and why the additional payment is due. Furthermore, Design-Builder and <br />all Subcontractors shall file with Owner certified copies of all payroll records relating to the <br />additional amount due. Disputed Amounts are due ten (10) working days following the <br />prior approved Payment Application. <br /> <br />8.2.1.4 Validity of Payment Requests. A payment request shall not be valid unless <br />it complies with the requirements of the Contract Documents. <br /> <br />8.2.2 Owner shall make payment within 30 days after Owner’s receipt of each properly submitted <br />and accurate Application for Payment, but in each case less the total of payments previously made, <br />less retainage, and less amounts properly withheld under Section 6.3 of the General Conditions. <br /> <br />8.3 Retainage on Phase 2 Work Progress Payments. <br /> <br />8.3.1 Pursuant to Chapter RCW 60.28, Owner will retain five percent of each approved <br />Application for Payment to be retained as a trust fund for the protection and payment of the claims <br />of any person arising under the contract and the state with respect to taxes imposed pursuant to <br />Titles 50, 51, and 82 RCW which may be due from Design-Builder. The moneys reserved may, at <br />the option of Design-Builder, be retained in accordance with the provisions of Chapter 60.28 RCW. <br /> <br />8.3.2 If the Design-Builder elects to submit a retainage bond on behalf of itself or one or more of <br />its Subcontractors in accordance with Chapter 60.28 RCW, each such bond must be issued on a <br />form provided by Owner by a surety licensed to do business in the state where the Work is located <br />with an A.M. Best rating of A-/IX or better on behalf of Design-Builder or A-/V on behalf of a <br />Subcontractor. Design-Builder is responsible for submitting retainage bond(s) that meet these <br />requirements to Owner on behalf of itself and/or any Subcontractor. Owner will not accept <br />retainage bonds submitted directly to it by a Subcontractor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.