Laserfiche WebLink
Laser Scan - As-Builts 0 $0.00 $0 $1,000.00 $0 $3,500.00 $0 $8,000.00 $0 $0.00 $0 03 <br />Laser Scan - Accessories 0 $0.00 $0 $0.00 $0 $13,500.00 $0 $0.00 $0 $0.00 $0 03 <br />Drone Flight 0 $0.00 $0 $0.00 $0 $600.00 $0 $0.00 $0 $0.00 $0 03 <br />Drone Equipment 0 $0.00 $0 $0.00 $0 $13,000.00 $0 $0.00 $0 $0.00 $0 03 <br />Drone - Thermal Envelope 0 $0.00 $0 $0.00 $0 $1,000.00 $0 $0.00 $0 $0.00 $0 03 <br />360 Job Photos (Holobuilder or StructionSite)0 $0.00 $0 $0.00 $0 $0.02 $0 $0.00 $0 $0.00 $0 03 <br />Matterport Camera System 0 $0.00 $0 $0.00 $0 $1,000.00 $0 $0.00 $0 $0.00 $0 03 <br />Visual Reporting and Statusing 0 $0.00 $0 $0.00 $0 $1,000.00 $0 $0.00 $0 $0.00 $0 03 <br />VDCO Dashboard 0 $0.00 $0 $0.00 $0 $1,000.00 $0 $0.00 $0 $0.00 $0 03 <br />3rd Party MEP Coordination 0 $0.00 $0 $0.00 $0 $0.20 $0 $0.00 $0 $0.00 $0 03 <br />Model Archive and Turnover 0 $0.00 $0 $0.00 $0 $1,000.00 $0 $0.00 $0 $0.00 $0 03 <br />Augmented Reality (HoloLens/iPad)0 $0.00 $0 $0.00 $0 $3,500.00 $0 $0.00 $0 $0.00 $0 03 <br />Virtual Reality (Oculus Quest)0 $0.00 $0 $0.00 $0 $600.00 $0 $0.00 $0 $0.00 $0 03 <br />3D Site Logistics Plan 0 $0.00 $0 $0.00 $0 $0.00 $0 $3,300.00 $0 $0.00 $0 03 <br />QC - VEO Inspections Setup & Maintenance 0 $0.00 $0 $0.00 $0 $0.00 $0 $3,300.00 $0 $0.00 $0 03 <br />QC - VEO QPL/6-Step Setup & Maintenance 0 $0.00 $0 $0.00 $0 $0.00 $0 $3,300.00 $0 $0.00 $0 03 <br />5D - Assemble Uploads (Estimating)0 $0.00 $0 $0.00 $0 $0.00 $0 $250.00 $0 $0.00 $0 03 <br />04 - Safety and First Aid -$0 <br />Periodic Screenings 0 EA $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 04 <br />Silica Pre-Placement Exam 0 EA $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 04 <br />Silica Medical Exam 0 EA $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 04 <br />First Aid Supplies 0 MO $0.00 $0 $175.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 04 <br />Safety Supplies 0 MO $0.00 $0 $250.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 04 <br />Staff Safety Supplies 0 MO $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 04 <br />AED Device 0 EA $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 04 <br />Fire Protection 0 LSUM $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 04 <br />Fire Ext (1 EA/3,000 sf)0 EA $0.00 $0 $75.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 04 <br />Back rails 0 LF $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 04 <br />Remove Steel Safety Cable 0 LF $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 04 <br />Horiz Opening Protection 0 SF $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 04 <br />Excavation Barricades 0 LF $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 04 <br />0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 04 <br />05 - Temporary Facilities -$0 <br />Office Space Rental 0 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Office Trailer 12'X60'0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Office Trailer 8'X30'0 MO $0.00 $0 $675.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Office Trailer - Arch.0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Setup & Remove Trailers 0 LSUM $1,120.00 $0 $1,250.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Storage & Saw Sheds 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Craft Dry Shack 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Temp. Toilets 3 each - weekly clean 0 MO $0.00 $0 $0.00 $0 $0.00 $0 $185.00 $0 $0.00 $0 05 <br />Temp. Toilets W/Wash Stations 3 each - weekly clean 0 MO $0.00 $0 $0.00 $0 $0.00 $0 $185.00 $0 $0.00 $0 05 <br />Professional Photos 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Preconstruct Photo Survey 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Bulletin Boards 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Misc. Jobsite Signs 0 $0.00 $0 $0.00 $0 $0.00 $0 $2,000.00 $0 $0.00 $0 05 <br />Project Sign 0 $0.00 $0 $0.00 $0 $0.00 $0 $5,000.00 $0 $0.00 $0 05 <br />Office Supplies & Equipment 0 MO $0.00 $0 $100.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Mail/Express Mail 0 WK $0.00 $0 $100.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Office Furniture 0 LSUM $0.00 $0 $5,000.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Jobsite Copy/Fax/Printer 0 MO $0.00 $0 $450.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Jobsite Computers 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Jobsite Software 0 MO $0.00 $0 $100.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Jobsite Printers 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Project Warranty Expense 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Jobsite Internet Charges 0 MO $0.00 $0 $300.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Watchman Service 0 MO $560.00 $0 $125.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Water person - Ice & Cups 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Ladders & Stairs 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Stair Tower 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Street Sweeper 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />TESC Consultant 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />TESC Maintenance 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />TECS Equipment 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />TESC Discharge Fee 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />TESC Supplies 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Filtration Sedimentation Tanks 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Temp. Roadways & Access 0 LSUM $0.00 $0 $0.00 $0 $0.00 $0 $10,000.00 $0 $0.00 $0 05 <br />Temporary Fencing 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Temporary Fencing - Screening 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Temporary Partitions 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Temporary Walkways 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Temp. Water & Service 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Temp. Water Usage Cost 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Temp. Utilities To Office Trailer 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Temp. Power Equip/Supplies 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Temp. Power Cost - Trailers 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Temp. Power Cost - Building 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Temp. Power Cost - Start-Up 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Temp. Parking Area 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />Employee Parking Fees 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 05 <br />06 - Building Services and Clean Up -$0 <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal