My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:56 PM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 5/1/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Hoist Elect Service 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />Hoist Elect Bills 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />Hoist Operator (1 Cage)0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />Hoist Operator (2 Cage)0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />Hoist Insurance 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />Hoist Third Party Inspections 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />Temporary Use of Elevator 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />**Forklifts**0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />RT Fork Lift 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />Warehouse Fork Lift 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />Forklift Operator 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />**Pickups**0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />Job Site Pickup 0 MO $0.00 $0 $0.00 $0 $975.00 $0 $0.00 $0 $0.00 $0 09 <br />Fuel 0 GAL $0.00 $0 $5.25 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />**All Terrain Vehicles**0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />Kawasaki Mule 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />**Air Compressor Rental**0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />185 CFM (D) tow behind 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />**Welders**0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />200 Amp (G) Welder 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />**Generators**0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />Multiquip 45 KW 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />Multiquip 60 KW 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />Multiquip 25 KW 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />Amida Light Plant 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />**Misc. Equipment**0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />Bobcat 763 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />Tennant Sweeper 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />Dewatering Equipment 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />Radio Base Station 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />Radios 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />Concrete Power Buggies 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />Finishing Mach. & Blades 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />Concrete Vibrators 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />Misc. Power Equip. __% X Lab 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />Small Tools __% X Lab 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />Repairs & Maintenance 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 09 <br />Travel Allowance Allowance 0 LS $0.00 $0 $7,500.00 $0 $0.00 $0 $80.00 $0 $0.00 $0 03 <br />10 - Sales & Use Taxes -$0 <br />Material Sales Tax 0 MO $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 10 <br />Equipment Use Tax 0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 10 <br />0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 10 <br />0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 $0.00 $0 10 <br />Summary - <br />Supervision and Administration 1 LS $256,748 $0 $0 $0 $256,748 <br />Misc. / Investigation 1 LS $0 $30,000 $0 $0 $30,000 <br />Plans and Printing 1 LS $0 $0 $0 $0 $0 <br />Travel 1 LS $0 $0 $0 $45,000 $45,000 <br />Safety and First Aid 1 LS $0 $0 $0 $0 $0 <br />Temporary Facilities 1 LS $0 $0 $0 $0 $0 <br />Building Services and Clean Up 1 LS $0 $0 $0 $0 $0 <br />Inspection and Quality Control 1 LS $0 $0 $0 $0 $0 <br />Temp. Heat and Protection 1 LS $0 $0 $0 $0 $0 <br />Equipment and Transportation 1 LS $0 $0 $0 $0 $0 <br />Sales & Use Taxes 1 LS $0 $0 $0 $0 $0 <br />Total $331,748 <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.