My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:56 PM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 5/1/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />LAND SURVEYING ● LAND USE PLANNING ● CIVIL ENGINEERING ● WETLAND SERVICES <br /> <br />P:\Work\Estimates\2025\P25HRM0128 Bayley Construction - New Everett Stadium\EST\P25HRM0128-Bayley Construction-02-2025.docx Initial [[t|1 ]] Date [[d|1 <br />]] <br /> <br />EVERETT <br />2822 Colby Ave, Suite 300 <br />Everett, WA 98201 <br />425-252-1884 <br />MOUNT VERNON <br />603 South First Street <br />Mount Vernon, WA 98273 <br />360-336-9199 <br />MAILING <br />2822 Colby Ave, Ste 300 <br />Everett, WA 98201 <br /> <br /> <br /> <br />www.HarmsenLLC.com <br />Bayley Construction <br />Maiya Loucks <br />8005 SE 28th St <br />Mercer Island, WA 98040 <br /> P25HRM0128 <br />February 19, 2025 <br />206-949-8626 <br />maiya.loucks@bayley.net <br /> <br />Harmsen, LLC (HARMSEN) appreciates your interest in having us provide professional services for the <br />property located in Everett, WA. Based on discussions with you and our understanding of the project <br />`needs, we propose the following: <br /> <br />SCOPE OF SERVICES: <br />• Perform a boundary and topographic survey for 28 properties and Right of Way per client <br />provided scope and markup, attached, for the purpose of proposed Outdoor Multipurpose <br />Stadium; <br />• Review City provided title report and plot easements, if any; <br /> FIXED FEE: $70,820 <br />• 3rd Party underground utility locate service; <br /> Estimated Time & Materials: $20,750 <br /> <br />ASSUMPTIONS: <br />• No corners will be set at this time; <br />• Client to provide a copy of the title report. Harmsen can coordinate ordering for an additional <br />fee if needed; <br />• The above estimate does not include any City, County or recording fees or any other <br />professional services. A proposal for Civil Engineering, Wetland Studies and Construction <br />Staking can be provided if needed; <br /> <br />Before beginning the project, we will need this proposal letter initialed and signed. If unforeseen <br />complications arise, HARMSEN reserves the right to stop work until a revised fee and/or schedule can be <br />negotiated. Deliverable(s) will be provided after final invoice has been satisfied. This fee proposal is valid <br />for 60 days. <br /> <br />We look forward to the opportunity to serve you. Please call us if you have any questions regarding this <br />proposal. <br /> <br />Sincerely, <br /> <br />Terms & Conditions, page 2 <br /> <br /> <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.