My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:56 PM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 5/1/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Everett – Outdoor Multipurpose Stadium <br /> <br /> Page 1 <br />Request for Survey Information <br />The survey shall include full topographic surface data and underground utilities a minimum of 50 <br />feet past the edge of the project boundaries as defined in the attached exhibit. We request the <br />following specific items: <br />· Survey shall be performed and documents prepared in such a manner so as to fully <br />comply with all local codes, ordinances and other requirements. <br />· All public and private utilities, both active and abandoned, shall be shown. Surveyor <br />shall coordinate with Owner, City, County, State (or any other AHJs), and ALL utility <br />purveyors in and around the project area to gather record documentation and verify site <br />utility information. This activity is in addition to the coordination with utility locate <br />services. <br />· Surveyor shall use a locate service for locating utilities. Existing utilities shall be <br />indicated by appropriate paint marks. All located utilities shall be incorporated into the <br />survey, including sizes obtained from record drawings. <br />· Surveyor shall coordinate paint marks and as-built documentation and resolve any <br />discrepancies. <br />· Show inverts at manholes and drainage structures for all pipes. Show pipe diameters, <br />pipe material, and direction of pipe. Include the structure size for all manholes and <br />drainage structures. <br />· Manhole and catch basin symbols shall be shown at center of structure, not center of lid. <br />· Gravity systems, i.e. storm drain and sewer, shall be surveyed to the next downstream <br />structure and the next upstream structure beyond the limits of survey. <br />· Utilities shall be shown continuous. Utility lines shown terminating shortly after a <br />structure or at survey limits are not acceptable. They should be shown to the next <br />downstream/upstream structure regardless of location. <br />· Include callouts for utility structures, control points, etc directly on the plan. Placing <br />these items in tables is not acceptable. <br />· Show overhead utility lines (eg: primary & secondary power, telecommunications, etc) <br />· Obtain topography by recording spot elevations at a maximum 25-foot on center spacing <br />(including along roadway centerlines, top of curb, bottom of curb, etc). Additional spots <br />will be required to adequately identify grade breaks and other topographic features. <br />Spot elevations shall be to the nearest .01 foot. <br />· Provide contours at 1’ intervals. Smaller intervals may be required in low-slope areas. <br />Larger intervals may be required in steep slope areas (ie > 1:1). <br />· Horizontal and vertical datum shall be clearly shown and have two reference points <br />within the area of the project. Include a description of the datum used on the survey <br />drawing. <br />· Provide a stamped and signed hard copy of survey (PDF is also acceptable) at no more <br />than 1" = 30' scale. Provide electronic file in AutoCAD format. <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.