My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Everett – Outdoor Multipurpose Stadium <br /> <br /> Page 2 <br />· Survey shall include, but not be limited to: <br />* Grade Breaks <br />* Limits of Pavement <br />* Pavement type <br />* Curbs and walls <br />* Curb ramps and driveways <br />* Trees (including caliper and type) 6-inch diameter and larger <br />* Limits of shrubs and vegetation <br />* Buildings and Structures. Include finished floor elevations for all ground floor(s) and <br />basements <br />* Fences, rockeries, retaining walls, or similar. Note type, length, width and height at <br />ends and every 20 feet (at midpoint if item is less than 40 feet) <br />* Utility Access Points—Manholes, Catch Basins, cleanouts, etc. <br />* Valve covers, identify irrigation valves separately from water main valves <br />* Light and Power Poles <br />* Fire Hydrants <br />* Signs <br />* Parking and channelization striping <br />* Monuments and survey control points <br />* Property Lines and Easements <br />The survey shall incorporate the following CAD requirements: <br />· All line work and text shall be in model space. Drawing units shall be decimal feet. <br />· Provide the triangulated irregular network (TIN) as a surface within the *.DWG file. The <br />surface should be set to not display any data. <br />· Surface data shall match the contours used in the final print. <br />· All CAD line work shall be “color by layer” and “linetype by layer”. <br />· All CAD elements intended for display in the survey print, including spot elevations and <br />contours, shall be basic CAD elements. Elements created by software like Civil 3D, <br />InRoads, Eaglepoint, etc shall be converted to basic CAD elements. <br />· Contour text shall be on a separate layer from the contours <br />· Contours shall be drawn at actual elevation. <br />· To accurately show contours at the limits of survey, the surveyor shall insure that all <br />contours created by erroneous triangulation of the spot elevations at the limits of survey <br />are removed. <br />· Monuments shall be shown at their true location in model space. If necessary, graphical <br />representations of far away monuments shall be accomplished in paper space. <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.