My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:56 PM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 5/1/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Everett – Outdoor Multipurpose Stadium <br /> <br /> Page 2 <br />· Survey shall include, but not be limited to: <br />* Grade Breaks <br />* Limits of Pavement <br />* Pavement type <br />* Curbs and walls <br />* Curb ramps and driveways <br />* Trees (including caliper and type) 6-inch diameter and larger <br />* Limits of shrubs and vegetation <br />* Buildings and Structures. Include finished floor elevations for all ground floor(s) and <br />basements <br />* Fences, rockeries, retaining walls, or similar. Note type, length, width and height at <br />ends and every 20 feet (at midpoint if item is less than 40 feet) <br />* Utility Access Points—Manholes, Catch Basins, cleanouts, etc. <br />* Valve covers, identify irrigation valves separately from water main valves <br />* Light and Power Poles <br />* Fire Hydrants <br />* Signs <br />* Parking and channelization striping <br />* Monuments and survey control points <br />* Property Lines and Easements <br />The survey shall incorporate the following CAD requirements: <br />· All line work and text shall be in model space. Drawing units shall be decimal feet. <br />· Provide the triangulated irregular network (TIN) as a surface within the *.DWG file. The <br />surface should be set to not display any data. <br />· Surface data shall match the contours used in the final print. <br />· All CAD line work shall be “color by layer” and “linetype by layer”. <br />· All CAD elements intended for display in the survey print, including spot elevations and <br />contours, shall be basic CAD elements. Elements created by software like Civil 3D, <br />InRoads, Eaglepoint, etc shall be converted to basic CAD elements. <br />· Contour text shall be on a separate layer from the contours <br />· Contours shall be drawn at actual elevation. <br />· To accurately show contours at the limits of survey, the surveyor shall insure that all <br />contours created by erroneous triangulation of the spot elevations at the limits of survey <br />are removed. <br />· Monuments shall be shown at their true location in model space. If necessary, graphical <br />representations of far away monuments shall be accomplished in paper space. <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.