My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Bayley Construction | March 12, 2025 Page 5 <br />File No. 0661-144-00 <br />2.Drill two borings to a depth of 40 feet using a truck-mounted drill rig. The borings will be converted into <br />monitoring wells. These two wells will also be instrumented with pressure transducers. Following the <br />drilling, IDW will be treated as described in Task 200. <br />3.Following completion of the two borings, we will perform laboratory testing of soil and include the <br />updated findings in a final version of the geotechnical report. <br />ADD ALTERNATE 1 (TASK 302). ENVIRONMENTAL SAMPLING <br />1.Field screening of soil from each boring for visual and olfactory evidence of contaminants and for <br />volatile organic compound (VOC) concentrations in vapor using a photoionization detector (PID). Two <br />soil samples will be collected from within the first 15 feet below ground surface (bgs) of each boring <br />(22 samples assuming all 11 borings will be drilled) for selected laboratory chemical analyses for <br />contaminants of potential concern. Based on field screening, up to five additional soil samples may be <br />collected from depths greater than 15 feet bgs also for selected chemical analyses, for a total of 27 <br />samples. The soil samples will be placed on ice in a cooler and submitted to OnSite Environmental Inc. <br />of Redmond, Washington (OnSite) for analysis under standard chain-of-custody protocols. <br />2.We will submit the soil samples for selected analyses for one or more of the following contaminants of <br />interest: <br />Total petroleum hydrocarbons as diesel-range organics (TPH-D) and as oil-range organics (TPH-O) <br />by Northwest Method NWTPH-Dx; <br />Total petroleum hydrocarbons as gasoline-range organics (TPH-G) by Northwest Method NWTPH- <br />Gx; <br />VOCs, including benzene, toluene, ethylbenzene and xylenes (BTEX) and halogenated VOCs <br />(HVOCs), by U.S. Environmental Protection Agency (EPA) Method 8260D; and <br />Resource Conservation and Recovery Act 8 metals (arsenic, barium, cadmium, chromium, mercury, <br />lead, silver, selenium) by EPA Method Series 200/6000/7000. <br />3.We will prepare an email summary of the findings from the soil chemical analysis. <br />TASK 400. FINAL DESIGN SUPPORT <br />1.Collect the groundwater data from the three previously installed monitoring wells. <br />2.Attend project team meetings during the design phase and provide consultation to the project team <br />during design. <br />3.Review the project shoring, dewatering, civil, and structural plans. <br />Schedule, Terms and Fees <br />We are prepared to begin Task 200 services immediately under our current NTP for environmental services. <br />Task 300 drilling is scheduled for March 17, 2025. One Call markings will need to be performed at least <br />one week prior to the start of drilling. Our field explorations will take approximately five days. We will then <br />submit samples to the laboratory for testing. We plan to issue our draft geotechnical report by <br />April 21, 2025. Once right-of-entry agreements are obtained for 2105 Pacific Avenue and 2201 Pacific <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.